SkillAgentSearch skills...

integration-orchestrator

Generate a phased delivery orchestration plan for creative-direction-driven work: which skills run when, what locks at which gate, how handoffs occur, and how the cadence implements in the team's tools (Jira, Linear, Notion, Figma, GitHub) with AI agents via MCP and CLI.

Install / Use

npx skills add rampstackco/claude-skills --skill integration-orchestrator

Installs into whichever agent you are using.

About this skill
📄

SKILL.md

Installable skill definition

Quality Score

86/100

Category

Design

Supported Platforms

Universal

Our assessment of integration-orchestrator

integration-orchestrator scores 86/100 on our quality scale, 158th of 261 Design skills we index.

Its SKILL.md is 21 KB long, well organised into 17 sections and no code examples: a thorough specification that gives an agent plenty to work with.

It has 902 GitHub stars, a meaningful sign that others use it.

Substance
30/30
Structure
13/20
Description
15/15
Adoption
13/20
Freshness
15/15

Maintenance, license and trust

  • The repository was last updated about 2 months ago, so integration-orchestrator is actively maintained.
  • Our last check on 2026-11-03 found the source still online.
  • It is released under the MIT license, a permissive license that allows use, modification and commercial use with attribution.
  • Its trust signals score 100/100, with no cautions. These come from repository metadata, not a code audit — read the skill file before letting an agent act on it.

Safety scan

No issues found

Our scan of the whole file found no instruction hijacking, hidden characters, credential access, data exfiltration or destructive commands. An AI review of the same text found nothing harmful.

AI review by kimi-k2.7-code on 2026-10-04. Automated pattern scan on 2026-10-04. It catches known dangerous patterns, not every risk — read a skill before letting an agent act on it.

integration-orchestrator compared with similar skills

All 4 of these similar skills score higher than integration-orchestrator; compare them before choosing.

SkillScoreStarsUpdatedFormat
integration-orchestrator (this skill)by rampstackco869022mo agoSKILL.md
Agent-Reachby Panniantong100112.3k8d agoCLAUDE.md
rufloby ruvnet10081.9ktodayCLAUDE.md
headroomby headroomlabs-ai10079.8ktodayCLAUDE.md
CowAgentby zhayujie10048.0ktodayCLAUDE.md

Frequently asked questions

How do I install integration-orchestrator?
Run npx skills add rampstackco/claude-skills --skill integration-orchestrator. The install tabs above show the steps for each supported agent.
Which AI agents does integration-orchestrator work with?
It is written for Universal, as a SKILL.md file. Other agents that read the same format can often use it too.
Is integration-orchestrator safe to use?
Our scan of the whole file found no instruction hijacking, hidden characters, credential access, data exfiltration or destructive commands. An AI review of the same text found nothing harmful. It is MIT-licensed and scores 100/100 on trust signals. Skills are instructions an agent will follow, so read the file before installing it and do not approve commands you do not understand.
Is integration-orchestrator still maintained?
The repository was last updated about 2 months ago, so integration-orchestrator is actively maintained.

name: integration-orchestrator description: "Generate a phased delivery orchestration plan for creative-direction-driven work: which skills run when, what locks at which gate, how handoffs occur, and how the cadence implements in the team's tools (Jira, Linear, Notion, Figma, GitHub) with AI agents via MCP and CLI. A temporal map of phases, lock points, handoff specs, gate definitions, and QA verification gates. Distinct from creative-brief (static project brief) and creative-direction (aesthetic direction). Triggers on integration orchestrator, delivery cadence, project orchestration, when does the brief lock, how to phase creative direction, design-development handoff, QA gate, agent-driven QA, and when a creative-direction project is starting, mid-flight with broken cadence, or integrating AI agents into PM workflow. Does NOT fire for project scoping (use creative-brief), aesthetic direction (use creative-direction), or general project management without a creative-direction throughline." category: product catalog_summary: "Sequence creative-direction work across phases, gates, handoffs, and QA verification" display_order: 3

Integration Orchestrator

A brief tells a team what to make. Creative direction tells them what it should feel like. Neither tells them when each decision locks, who reviews what, or what stops the next phase from starting before the prior one is done. That is the gap this skill fills.

The output is a phased orchestration plan the PM can paste into a calendar Monday morning and start running Tuesday. Phases, gates, lock points, handoffs, QA verification rules, and a platform-specific implementation guide for whatever stack the team actually uses (Jira, Linear, Notion, Figma, GitHub, agile sprints).


What this skill is

A creative-direction project has three layers. The brief layer defines scope, audience, deliverables, constraints, success criteria. The direction layer defines tone, aesthetic, relationship, and sensory ambition. Both produce written artifacts. Neither answers the temporal question: when does the brief lock, when does identity lock, when does copy lock, who reviews each, what gets blocked while a gate is open, what happens when a downstream task discovers the brief is wrong, and what makes "Done" mean tested rather than self-reported.

This skill produces that temporal layer. Most teams have briefs and creative direction but no orchestration plan. The result, by week 3, is everyone working in parallel with no shared sense of which decisions are still open and which are locked. Brief drift. Re-work. Identity tokens shifted after copy was already drafted against the old ones. Engineering shipping before design had a chance to review. "Done" tickets that were never actually verified.

The orchestration plan answers all of that. It is not theory. It is a phased timeline with calendar weeks, ticket templates the PM can paste into Jira or Linear, MCP commands for setup, gate definitions with measurable pass criteria, handoff specs with artifact requirements, and QA verification gates with Playwright or Chrome MCP invocations.


When to use

  • Starting a new brand build, rebrand, or campaign and the team needs to sequence the work
  • Mid-flight project where the brief is being revisited and downstream work is suffering from constant resets
  • Setting up a new team's agent-driven workflow with MCPs and CLI integration
  • Multi-team work where handoffs between brand, design, and engineering have broken down
  • Establishing QA verification gates so "Done" is measurable, not self-reported
  • Migrating from ad-hoc orchestration to a documented cadence
  • Onboarding a new PM or design lead onto an existing project that has running tickets but no documented sequencing
  • Adding new platforms or tools to an existing workflow and the cadence needs to be re-mapped

When NOT to use

  • Use creative-brief instead if the deliverable is the project brief itself: scope, audience, deliverables, constraints, success criteria. The orchestrator skill takes the brief as input.
  • Use creative-direction if the deliverable is the aesthetic direction: tone, aesthetic, relationship, sensory. The orchestrator schedules the work that answers to the direction; it does not produce the direction.
  • Generic project management software is the platform; this skill produces the plan that runs IN the platform. Do not run this skill if the team needs help picking a tool; it assumes the tool stack is already chosen.
  • Sprint-planning tactics (story-pointing, retros, velocity charts) live downstream of orchestration. The skill produces the cadence; sprint planning fills it in.

Required inputs

  • Project type. New brand build, rebrand, single landing page, campaign, identity refresh, website refresh, microsite, product launch. The type implies a default phase decomposition that the skill adapts to the specific project.
  • Team composition. Total size and role mix. Solo, small (2-3), medium (4-7), large (8+). Whether AI agents (Claude Code, Claude in Chrome, others) participate in production, QA, or both.
  • Tool stack. Which of Jira, Linear, Notion, Figma, GitHub the team uses. Plus QA tooling (Playwright, Chrome MCP, Windows MCP, mobile testing harnesses) if known. Plus communication and paging channel (Slack, email, in-tool mention). The output adapts to the actual stack.
  • Timeline target. Express (compressed timelines, fewer reviewers, accept higher rework risk), standard (typical cadence at the project type's default duration), or thorough (more reviewers, formal phase reviews, lower rework risk at the cost of slower delivery).
  • Existing constraints. What is already locked? Brief approved, identity locked, platform fixed, brand voice already shipped, content management system non-negotiable. The orchestrator plan handles greenfield and mid-flight equally; the existing constraints input is how mid-flight projects are accommodated.
  • AI agent participation. Which workflows include agents and at what fidelity. Examples: Claude Code does production tasks against a state file in the repo; Claude in Chrome runs human-readable QA flows on the staging deployment; the agent has access to the Linear MCP and the GitHub MCP but not Jira; the agent can move tickets between Todo, In Progress, Waiting, and Blocked but cannot move to Done (Done requires a human verification step).
  • Risk profile. Optional input naming the failure modes the team is most worried about: brief drift, parallel-work conflicts, QA gaps, agent runaway. The orchestration plan front-loads mitigations for the named risks.

The framework: 7 considerations for orchestration

A delivery orchestration plan sits at the intersection of seven considerations. Each filters the choices that follow.

1. Phasing

How the project decomposes into phases. The standard shape is discovery, direction, identity, production, QA, and launch. Not every project type uses every phase. A campaign skips identity (it inherits the locked brand identity). A landing page collapses discovery and direction into a single brief phase. A rebrand replaces discovery with audit (positioning is known; the audit assesses what to keep).

The shape of the phases matters less than the explicit answer to two questions per project: which phases run sequentially because the downstream phase cannot start without the prior phase's output, and which phases overlap because their outputs do not depend on each other. Identity must complete before copy starts (copy depends on tone-axis position, which is part of identity). QA must complete before launch. Discovery and audit may overlap with brief drafting, because the brief consumes discovery findings as they emerge.

2. Gates

A gate is the approval moment that governs phase transition. The standard gates are brief approval, direction approval, identity approval, voice approval, copy approval, design approval, QA verification, and launch readiness. Each gate has a trigger (the work that opens it), an approver (the person or test suite that passes it), required-to-pass criteria (the measurable thing that says yes or no), what's blocked until the gate passes, and what's already locked from prior gates.

Gates work when the criteria are measurable. "Brief approved" is too vague; "client signed the brief artifact in writing or in a recorded review" is measurable. "QA passed" is too vague; "Playwright critical-flow suite green, console error count at or below baseline, accessibility floor maintained" is measurable. Gates that are not measurable become political; gates that are measurable become structural.

3. Lock points

A lock point is the moment an artifact becomes immutable. The brief locks after direction is approved. Identity tokens lock after the identity gate. Voice rules lock after voice approval. Copy locks per page after copy approval. Once locked, the artifact cannot be changed by downstream work; it can only change via a formal change request that triggers re-review of dependent work.

Without explicit lock points, every artifact is conceptually editable forever. That is the source of brief drift. The orchestrator plan names what locks at which gate, where the locked artifact lives, who can request a change, and what gets re-reviewed if a change is approved. Locked is not the same as final; locked means "any further change to this triggers downstream review work, so make changes deliberately."

4. Handoffs

A handoff is the moment work transfers between phases or skills. The standard handoffs are discovery to brief, brief to identity, brief to voice, identity plus voice to copy, identity plus copy to design, design to engineering, engineering to launch. Each transfers specific artifacts and decisions. Each leaves some things open and locks others.

There is also a cross-cutting handoff: the adjacent observation handoff. While working on the homepage hero, an agent or person notices the footer copy is inconsistent with the new voice. That observation is not the current task. It is filed as an observation in the project triage queue. The PM or tech lead reviews observations on a regular cadence and triages them into proper tickets. This pattern keeps current work focused while not losing the contextually-relevant findings the team would otherwise either drop or derail current work to address.

5. Team-size modulation

A 2-person team and a 12-person team need different orchestration. Solo work is one person playing every role. Small (2-3) means a single reviewer per gate and async handoffs are fine. Medium (4-7) needs multiple reviewers and async sync points. Large (8+) needs formal phase reviews, a dedicated PM for orchestration, and explicit cross-track sync ceremonies because parallel tracks drift apart without them.

The orchestration plan output modulates by scale. Solo gets self-review checklists per phase. Small gets per-gate "review by" assignments. Medium gets reviewer rotation and within-phase mini-gates. Large gets formal phase reviews, cross-track sync, and a brief-owner role. The framework is the same; the cadence's review density and ceremony level change.

6. Tool-stack implementation

Phases and gates exist in concept; they implement in tools. The orchestration plan specifies the implementation per platform: in Jira, phases become Epics with custom fields for "Phase", "Locked", "Approver", and "Gate Status"; in Linear, phases become Projects with cycles and label-driven views; in Notion, the brief becomes a database row with relation properties tying to direction docs, identity specs, voice guides, and copy decks; in Figma, phases become library folders with frame-level review status; in GitHub, phases interact with branch protection, PR templates, and CODEOWNERS-driven review routing.

Where MCPs exist (Atlassian, Linear, Notion, GitHub), the plan specifies which orchestration setup ope

Truncated for display — read the full file on GitHub.

Related Skills

View on GitHub
GitHub Stars902
CategoryDesign
Updated2mo ago
Forks124

Languages

JavaScript

Trust signals

100/100

From repository metadata: license, adoption, age and documentation. Not a code audit — see the Safety scan above for what the skill file itself contains.

No cautions
integration-orchestrator — Universal Skill: Install & Safety Check | SkillAgent