Build a phase-gated EOL checklist sized to the sunset, with a named owner on every item

Install / Use

npx skills add deanpeters/Product-Manager-Skills --skill eol-checklist

Installs into whichever agent you are using.

About this skill
📄

SKILL.md

Installable skill definition

Quality Score

86/100

Supported Platforms

Zed

Tags

Our assessment of eol-checklist

eol-checklist scores 86/100 on our quality scale, 2324th of 4,698 Development & Engineering skills we index (top 50%).

Its SKILL.md is 12 KB long, well organised into 28 sections and no code examples: a thorough specification that gives an agent plenty to work with.

With 7,063 GitHub stars, it is one of the more widely adopted skills in the catalogue.

Substance
30/30
Structure
13/20
Description
12/15
Adoption
16/20
Freshness
15/15

Maintenance, license and trust

  • The repository was last updated about 3 months ago, so eol-checklist is actively maintained.
  • Our last check on 2026-11-03 found the source still online.
  • No license is declared. By default that means all rights are reserved: you can read it, but reusing or redistributing it is not clearly permitted. Ask the author before building on it commercially.
  • Its trust signals score 88/100, with 1 caution from licensing, adoption, age or documentation. These come from repository metadata, not a code audit — read the skill file before letting an agent act on it.

Safety scan

No issues found

Our scan of the whole file found no instruction hijacking, hidden characters, credential access, data exfiltration or destructive commands. An AI review of the same text found nothing harmful.

AI review by kimi-k2.7-code on 2026-09-27. Automated pattern scan on 2026-09-26. It catches known dangerous patterns, not every risk — read a skill before letting an agent act on it.

eol-checklist compared with similar skills

All 4 of these similar skills score higher than eol-checklist; compare them before choosing.

SkillScoreStarsUpdatedFormat
eol-checklist (this skill)by deanpeters867.1k3mo agoSKILL.md
taste-skillby Leonxlnx100116.8k8d agoCLAUDE.md
ai-job-searchby ai-job-search-dev10072.1ktodayCLAUDE.md
claude-howtoby luongnv8910047.3k2d agoCLAUDE.md
lobehubby lobehub10085.6ktodayMCP Server

Frequently asked questions

How do I install eol-checklist?
Run npx skills add deanpeters/Product-Manager-Skills --skill eol-checklist. The install tabs above show the steps for each supported agent.
Which AI agents does eol-checklist work with?
It is written for Zed, as a SKILL.md file. Other agents that read the same format can often use it too.
Is eol-checklist safe to use?
Our scan of the whole file found no instruction hijacking, hidden characters, credential access, data exfiltration or destructive commands. An AI review of the same text found nothing harmful. It declares no license and scores 88/100 on trust signals. Skills are instructions an agent will follow, so read the file before installing it and do not approve commands you do not understand.
Is eol-checklist still maintained?
The repository was last updated about 3 months ago, so eol-checklist is actively maintained.

name: eol-checklist argument-hint: "[product being sunset, and any hard dates]" description: "Build a phase-gated EOL checklist sized to the sunset, with a named owner on every item. Use when the decision to retire is made and you need the operational plan." intent: >- Generate a phase-gated EOL checklist tailored to the complexity of the sunset. Covers up to 15 functional areas across the lifecycle gates, but right-sizes the output so a minor feature deprecation gets a short punch list while a flagship product retirement gets the full cross-functional playbook. Every item names a verb and an owner. type: component theme: eol-transition best_for:

  • "Turning a sunset decision into an operational plan with owners and dates"
  • "Making sure a retirement doesn't strand data, contracts, or inventory"
  • "Right-sizing process so a feature deprecation doesn't get a flagship playbook" scenarios:
  • "We've decided to retire the legacy module in December — what actually has to happen between now and then?"
  • "Hardware line with channel partners and service contracts; I need the full cross-functional checklist" estimated_time: "20-40 min"

EOL Checklist

Purpose

Turn a sunset decision into a phase-gated operational plan: what must happen, in which lifecycle phase, and who owns it. The output is a working checklist — sticky-note-sized items, each with a verb and a named function — not a strategy document.

The checklist is sized to the sunset. A deprecated internal tool gets a dozen items across three phases. A regulated hardware line gets a cross-functional playbook across six phases with gate criteria between them. Both are correct; using the wrong one is the failure.

Input

Works best with: The product being sunset and any dates you're already committed to.

Also useful: Customer and revenue scale, whether a replacement exists and how ready it is, contract or regulatory obligations, and whether hardware, inventory, or channel partners are in play.

Anything supplied with the invocation itself — text after the skill name, a pasted context dump, or an appended ARGUMENTS: line — counts as answers already given. Use it and skip whatever it covers; don't re-ask.

Arriving empty-handed? That works too. The skill asks up to three questions — what's being sunset and at what scale, whether there's a replacement, and what hard deadlines exist — then picks a level and builds. Unknowns become labeled assumptions rather than blockers.

Example invocations:

  • EOL checklist for our legacy reporting module, shutting down Dec 31, ~400 accounts.
  • Build the heavy checklist for a hardware retirement — service contracts, 8 resellers, UL certified.

Key Concepts

Right-Size Before You Build

Not all EOLs play out the same. Most land in the middle. Pick the level deliberately:

| | Level 1 — Light | Level 2 — Standard | Level 3 — Heavy | |---|---|---|---| | Typical scope | Feature, internal tool, unversioned API | Commercial product, active customers | Revenue-critical, hardware, regulated | | Phases used | 2-3 (NSC, EOS, EOL) | 4-5 (NSC, EOS, EOE, EOM, EOL) | All 6 (NSC through EOSRV) | | Functional areas | 4 | 11 | 15 | | Gate criteria | Not needed | Between major phases | Between every phase, with approvers | | Output feel | Punch list | Working checklist with owners and dates | Cross-functional playbook |

Level 2 is the default. Recommend a level, say why in one line, and let the user move it. If they go lighter, name the specific area that drops out so the choice is informed. Never default to Level 3 — a heavy checklist applied to a light sunset teaches teams that EOL process is ceremony, and they'll skip it next time when it matters.

The level is yours to change mid-build. "Actually make this heavier" is a normal thing to hear after the Legal row surfaces something.

The Lifecycle Gates

  • GA (General Availability): Actively sold and fully supported
  • NSC (Notice of Status Change): The decision is communicated; planning begins
  • EOS (End of Sale): No new customers can purchase
  • EOE (End of Expansion): Existing customers cannot add capacity or seats
  • EOR (End of Renewal): Existing contracts will not be renewed
  • EOM (End of Maintenance): Bug fixes and patches stop
  • EOL (End of Life): The product is retired
  • EOSRV (End of Service): All support and service obligations end

Which of these become checklist phases: GA is a state, not a phase of work — nothing is checklisted there. EOR is contract-driven and only appears when renewals are in play. So working checklists usually span the six actionable phases: NSC, EOS, EOE, EOM, EOL, EOSRV, with EOR inserted when subscription or service contracts run past EOS.

Naming the gates you're not using is as useful as naming the ones you are. A Level 1 checklist should say "EOE and EOSRV don't apply — nothing to expand, nothing to service."

The Fifteen Functional Areas

Filtered by level. The parenthetical marks the lowest level where each appears:

| Area | Level | |---|---| | Product and Strategy | 1 | | Engineering and Technical | 1 | | Support | 1 | | Documentation and Training | 1 | | Legal and Contractual | 2 | | Financial Planning | 2 | | Sales | 2 | | Marketing | 2 | | Customer Success | 2 | | IT Systems | 2 | | Data Management | 2 | | Inventory and Supply Chain | 3 | | Channel and Partner Management | 3 | | Regulatory and Compliance | 3 | | Internal Organizational Alignment | 3 |

The Sticky-Note Rule

Every item is 4 to 8 words, names a verb, and carries a named owner (a function, not a person's calendar). "Legal reviews contracts" is an item. "Ensure appropriate review of all relevant contractual obligations across the customer base" is a paragraph wearing a checkbox.

Why the owner is mandatory: an unowned item is a wish. Forcing a function onto every line surfaces cross-functional gaps early — when you can't name who owns "notify channel partners," you have just discovered that nobody does.

Phase Gates Are Commitments, Not Dates

A phase gate is what must be true before you advance, with an approver. "EOS to EOE: last-time-buy orders closed — Approver: Sales VP." This is what stops an EOL from being one announcement followed six months later by somebody quietly pulling a plug.

Anti-Patterns (what this is NOT)

  • Not a project plan. No Gantt, no dependencies graph, no resource loading.
  • Not exhaustive by default. Coverage proportional to risk, not maximum ceremony.
  • Not the decision. If the sunset itself is still in question, this is premature.
  • Not a substitute for the conversations. A checklist item saying "align with Legal" is not alignment with Legal.

Application

Step 1: Set the level

Recommend from blast radius — customers, revenue, contracts, hardware, partners — then present all three and let the user choose. If the level is genuinely unclear, ask:

"How complex is this sunset?

  1. Light — a feature, internal tool, or unversioned API. Few users, all reachable.
  2. Standard — a commercial product with paying customers and contracts.
  3. Heavy — revenue-critical, hardware in the field, channel partners, or regulated.

Most sunsets are Standard. Which sounds like yours?"

Step 2: Select phases in scope

Map the level to phases, then check for the two overrides:

  • Contracts running past EOS? Insert EOR.
  • No service obligations at all? Drop EOSRV and say so.

If a date is genuinely unknown, write TBD — and if a date shouldn't be set yet (no migration path exists), write Not scheduled and add an item naming the precondition. An invented EOL date is a promise you will break in public.

Step 3: Build items per phase, per area

For each phase in scope, walk the functional areas warranted by the level. Each item:

  • Starts with a verb
  • Is 4 to 8 words
  • Names an owning function
  • Belongs to exactly one phase — the phase where the work happens, not where it's announced

Cover, at minimum, the four things sunsets most often strand:

  1. Data — export format, availability window, deletion schedule
  2. Contracts — renewal language, SLA terms, refunds or credits owed
  3. Access — API keys, integrations, SSO, downstream systems that read from it
  4. Money — forecast adjustment, revenue recognition, cost of the sunset itself

Step 4: Write gate criteria (Level 2+)

For each phase transition, list what must be true and who signs. Three to five criteria per gate is plenty. If you can't name an approver, the gate isn't real.

Step 5: Post-EOL actions and assumptions

Always include a short post-EOL block — archival, final report, and a lessons-learned review. The review is the item teams cut first and regret most; the next sunset is always easier when someone wrote down what surprised you in this one.

Close with assumptions to validate — every unknown from Step 1, stated plainly.

Final Step: Offer what comes next

"Where next?

  1. Map the stakeholder conversations — who to talk to, in what order (Recommended)
  2. Draft the customer announcement — see eol-message
  3. Build the internal enablement pack — support FAQ, sales talking points, objections
  4. Convert this to a dated timeline — calendar dates against each phase

Reply with a number, a combination ('1 & 3'), or your own path."


Examples

  • examples/sample.md — Fieldlight Classic Dispatch (SaaS, Level 2, five phases)
  • examples/sample-industrial.md — NFA-200 controller line (industrial, Level 3, six phases with a deliberately undated EOL)

Common Pitfalls

Pitfall 1: Ceremony Inflation

Symptom: Every sunset gets the 15-area, six-phase playbook because it's "more thorough."

Consequence: Teams learn EOL process is theater, skip it entirely on the next one — and the next one is the one with the contracts.

Fix: Right-size deliberately. A Level 1 checklist that gets used beats a Level 3 that gets ignored.


Pitfall 2: Unowned Items

Symptom: "Ensure customer data is exported." Owner: blank, or "the team."

Consequence: Everyone assumes someone else has it. On shutdown day, nobody did.

Fix: Every item names a function. If you can't name one, that's the finding — escalate it rather than papering over it.


Pitfall 3: The Invented Date

Symptom: An EOL date gets written down because the checklist template had a blank for it.

Consequence: You announce a date, discover the migration path doesn't exist, and move it. Customers who planned around the first date stop believing the second.

Fix: Not scheduled is a legitimate entry. Pair it with the precondition that would let you schedule it.


Pitfall 4: Phase Collapse

Symptom: Everything lands in one phase called "EOL."

Consequence: You stop sales, stop support, and shut down on the same day. Customers experience it as an outage with advance notice.

Fix: Separate the gates. Stopping sales is cheap and early; stopping service is expensive and last.


Pitfall 5: Forgetting the Downstream Readers

Symptom: The checklist covers the product and its customers, but not the four internal systems that quietly query its API.

Consequence: The product retires on schedule and three dashboards, a billing job, and a partner integration break the next morning.

Fix: The IT Systems and Data Management areas exist for this. At Level 1, still ask once: what reads from this?


References

Related Skills

These stand on their own — none is a prerequisite for this skill, and this skill isn't a prerequisite for them. If you already picked a level elsewhere, just say "Level 2" and this skill will build to it; there's no handoff artifact to carry.

Truncated for display — read the full file on GitHub.

Related Skills

View on GitHub
GitHub Stars7.1k
CategoryDevelopment
Updated2mo ago
Forks846

Languages

Shell

Trust signals

88/100

From repository metadata: license, adoption, age and documentation. Not a code audit — see the Safety scan above for what the skill file itself contains.

1 medium