capacity-planning

Plan organizational capacity for construction projects. Forecast resource needs, identify capacity gaps, and support strategic planning for project pursuit and staffing.

Install / Use

npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill capacity-planning

Installs into whichever agent you are using.

About this skill
📄

SKILL.md

Installable skill definition

Quality Score

91/100

Category

Automation

Supported Platforms

Universal

Our assessment of capacity-planning

capacity-planning scores 91/100 on our quality scale, 1105th of 2,771 Automation skills we index (top 40%).

Its SKILL.md is 20 KB long, well organised into 13 sections with 4 code examples: a thorough specification that gives an agent plenty to work with.

It has 333 GitHub stars, a meaningful sign that others use it.

Substance
30/30
Structure
20/20
Description
15/15
Adoption
11/20
Freshness
15/15

Maintenance, license and trust

  • The repository was last updated about 3 months ago, so capacity-planning is actively maintained.
  • Our last check on 2026-11-20 found the source still online.
  • It is released under the MIT license, a permissive license that allows use, modification and commercial use with attribution.
  • Its trust signals score 100/100, with no cautions. These come from repository metadata, not a code audit — read the skill file before letting an agent act on it.

Safety scan

No issues found

Our scan of the whole file found no instruction hijacking, hidden characters, credential access, data exfiltration or destructive commands. An AI review of the same text found nothing harmful.

AI review by kimi-k2.7-code on 2026-10-07. Automated pattern scan on 2026-10-07. It catches known dangerous patterns, not every risk — read a skill before letting an agent act on it.

capacity-planning compared with similar skills

All 4 of these similar skills score higher than capacity-planning; compare them before choosing.

SkillScoreStarsUpdatedFormat
capacity-planning (this skill)by datadrivenconstruction913333mo agoSKILL.md
Agent-Reachby Panniantong100113.3k12d agoCLAUDE.md
rufloby ruvnet10082.1ktodayCLAUDE.md
headroomby headroomlabs-ai10080.2ktodayCLAUDE.md
Claude-Code-Game-Studiosby Donchitos10040.2k10d agoCLAUDE.md

Frequently asked questions

How do I install capacity-planning?
Run npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill capacity-planning. The install tabs above show the steps for each supported agent.
Which AI agents does capacity-planning work with?
It is written for Universal, as a SKILL.md file. Other agents that read the same format can often use it too.
Is capacity-planning safe to use?
Our scan of the whole file found no instruction hijacking, hidden characters, credential access, data exfiltration or destructive commands. An AI review of the same text found nothing harmful. It is MIT-licensed and scores 100/100 on trust signals. Skills are instructions an agent will follow, so read the file before installing it and do not approve commands you do not understand.
Is capacity-planning still maintained?
The repository was last updated about 3 months ago, so capacity-planning is actively maintained.

name: "capacity-planning" description: "Plan organizational capacity for construction projects. Forecast resource needs, identify capacity gaps, and support strategic planning for project pursuit and staffing." homepage: "https://datadrivenconstruction.io" metadata: {"openclaw": {"emoji": "🚀", "os": ["darwin", "linux", "win32"], "homepage": "https://datadrivenconstruction.io", "requires": {"bins": ["python3"]}}}

Capacity Planning

Overview

Strategic capacity planning for construction organizations. Forecast resource requirements based on project pipeline, identify capacity constraints, optimize staffing levels, and support go/no-go decisions on new project pursuits.

Capacity Planning Framework

┌─────────────────────────────────────────────────────────────────┐
│                  CAPACITY PLANNING                               │
├─────────────────────────────────────────────────────────────────┤
│                                                                  │
│  DEMAND FORECAST           CAPACITY ANALYSIS        DECISIONS   │
│  ───────────────           ─────────────────        ─────────   │
│                                                                  │
│  Current Projects    →     Available:               Pursue new  │
│  • Project A (Active)      👷 PM: 5                 project?    │
│  • Project B (Active)      👷 Supers: 12            ────────    │
│  • Project C (Starting)    📐 Engineers: 8         ✅ Capacity  │
│                                                    ⚠️ Stretch   │
│  Pipeline:            →    Required:               ❌ Decline   │
│  • Bid D (60% win)         👷 PM: 7                             │
│  • Bid E (40% win)         👷 Supers: 15                        │
│  • Opportunity F           📐 Engineers: 10                     │
│                                                                  │
│  GAP ANALYSIS:             ACTIONS:                             │
│  • PM: -2 (deficit)        • Hire 2 PMs                         │
│  • Supers: -3 (deficit)    • Promote from within                │
│  • Engineers: -2 (deficit) • Partner with firm                  │
│                                                                  │
└─────────────────────────────────────────────────────────────────┘

Technical Implementation

from dataclasses import dataclass, field
from typing import List, Dict, Optional, Tuple
from datetime import datetime, timedelta
from enum import Enum
import statistics

class ResourceRole(Enum):
    PROJECT_MANAGER = "project_manager"
    SUPERINTENDENT = "superintendent"
    PROJECT_ENGINEER = "project_engineer"
    ESTIMATOR = "estimator"
    SCHEDULER = "scheduler"
    SAFETY_MANAGER = "safety_manager"
    QC_MANAGER = "qc_manager"
    ADMIN = "admin"

class ProjectPhase(Enum):
    PURSUIT = "pursuit"
    PRECONSTRUCTION = "preconstruction"
    CONSTRUCTION = "construction"
    CLOSEOUT = "closeout"

class OpportunityStatus(Enum):
    IDENTIFIED = "identified"
    PURSUING = "pursuing"
    BID_SUBMITTED = "bid_submitted"
    NEGOTIATING = "negotiating"
    WON = "won"
    LOST = "lost"

@dataclass
class StaffMember:
    id: str
    name: str
    role: ResourceRole
    capacity: float = 1.0  # FTE
    current_assignment: str = ""
    availability_date: datetime = None
    skills: List[str] = field(default_factory=list)
    max_project_value: float = 0  # Max project size they can handle

@dataclass
class ProjectDemand:
    project_id: str
    project_name: str
    value: float
    phase: ProjectPhase
    start_date: datetime
    end_date: datetime
    probability: float = 1.0  # 1.0 for active, <1 for pipeline
    resource_needs: Dict[ResourceRole, float] = field(default_factory=dict)

@dataclass
class CapacityGap:
    role: ResourceRole
    period_start: datetime
    period_end: datetime
    demand: float
    capacity: float
    gap: float
    severity: str

@dataclass
class CapacityForecast:
    forecast_date: datetime
    horizon_months: int
    total_demand_fte: float
    total_capacity_fte: float
    utilization_pct: float
    gaps: List[CapacityGap]
    recommendations: List[str]

class CapacityPlanner:
    """Plan organizational capacity for construction projects."""

    # Typical staffing ratios by project value
    STAFFING_RATIOS = {
        ResourceRole.PROJECT_MANAGER: 20000000,      # 1 PM per $20M
        ResourceRole.SUPERINTENDENT: 10000000,       # 1 Super per $10M
        ResourceRole.PROJECT_ENGINEER: 15000000,     # 1 PE per $15M
        ResourceRole.ESTIMATOR: 50000000,            # 1 Estimator per $50M (pursuit)
        ResourceRole.SCHEDULER: 30000000,            # 1 Scheduler per $30M
        ResourceRole.SAFETY_MANAGER: 25000000,       # 1 Safety per $25M
    }

    # Phase factors (multiply by role ratio)
    PHASE_FACTORS = {
        ProjectPhase.PURSUIT: {"estimator": 1.5, "pm": 0.3},
        ProjectPhase.PRECONSTRUCTION: {"pm": 0.7, "pe": 0.5, "scheduler": 0.5},
        ProjectPhase.CONSTRUCTION: {"pm": 1.0, "super": 1.0, "pe": 1.0, "safety": 1.0},
        ProjectPhase.CLOSEOUT: {"pm": 0.5, "pe": 0.3, "admin": 1.0}
    }

    def __init__(self, organization_name: str):
        self.organization_name = organization_name
        self.staff: Dict[str, StaffMember] = {}
        self.projects: Dict[str, ProjectDemand] = {}
        self.pipeline: Dict[str, ProjectDemand] = {}

    def add_staff(self, id: str, name: str, role: ResourceRole,
                 capacity: float = 1.0, current_assignment: str = "",
                 availability_date: datetime = None,
                 max_project_value: float = 0) -> StaffMember:
        """Add staff member to capacity pool."""
        member = StaffMember(
            id=id,
            name=name,
            role=role,
            capacity=capacity,
            current_assignment=current_assignment,
            availability_date=availability_date or datetime.now(),
            max_project_value=max_project_value
        )
        self.staff[id] = member
        return member

    def add_active_project(self, id: str, name: str, value: float,
                          phase: ProjectPhase, start_date: datetime,
                          end_date: datetime) -> ProjectDemand:
        """Add active project to demand forecast."""
        # Calculate resource needs based on value and phase
        needs = self._calculate_resource_needs(value, phase)

        project = ProjectDemand(
            project_id=id,
            project_name=name,
            value=value,
            phase=phase,
            start_date=start_date,
            end_date=end_date,
            probability=1.0,
            resource_needs=needs
        )
        self.projects[id] = project
        return project

    def add_pipeline_opportunity(self, id: str, name: str, value: float,
                                 win_probability: float,
                                 expected_start: datetime,
                                 duration_months: int) -> ProjectDemand:
        """Add pipeline opportunity to demand forecast."""
        needs = self._calculate_resource_needs(value, ProjectPhase.CONSTRUCTION)

        opportunity = ProjectDemand(
            project_id=id,
            project_name=name,
            value=value,
            phase=ProjectPhase.PURSUIT,
            start_date=expected_start,
            end_date=expected_start + timedelta(days=duration_months * 30),
            probability=win_probability,
            resource_needs=needs
        )
        self.pipeline[id] = opportunity
        return opportunity

    def _calculate_resource_needs(self, value: float,
                                  phase: ProjectPhase) -> Dict[ResourceRole, float]:
        """Calculate resource needs based on project value and phase."""
        needs = {}

        for role, ratio in self.STAFFING_RATIOS.items():
            base_need = value / ratio

            # Apply phase factor
            phase_key = role.value.split('_')[0][:3]
            factor = 1.0
            if phase in self.PHASE_FACTORS:
                factor = self.PHASE_FACTORS[phase].get(phase_key, 1.0)

            needs[role] = base_need * factor

        return needs

    def get_current_capacity(self) -> Dict[ResourceRole, float]:
        """Get current capacity by role."""
        capacity = {role: 0.0 for role in ResourceRole}

        for member in self.staff.values():
            if member.availability_date <= datetime.now():
                capacity[member.role] += member.capacity

        return capacity

    def get_capacity_at_date(self, target_date: datetime) -> Dict[ResourceRole, float]:
        """Get projected capacity at future date."""
        capacity = {role: 0.0 for role in ResourceRole}

        for member in self.staff.values():
            if member.availability_date <= target_date:
                capacity[member.role] += member.capacity

        return capacity

    def calculate_demand(self, target_date: datetime,
                        include_pipeline: bool = True,
                        pipeline_threshold: float = 0.0) -> Dict[ResourceRole, float]:
        """Calculate resource demand at date."""
        demand = {role: 0.0 for role in ResourceRole}

        # Active projects
        for project in self.projects.values():
            if project.start_date <= target_date <= project.end_date:
                for role, need in project.resource_needs.items():
                    demand[role] += need * project.probability

        # Pipeline (weighted by probability)
        if include_pipeline:
            for opp in self.pipeline.values():
                if opp.probability >= pipeline_threshold:
                    if opp.start_date <= target_date <= opp.end_date:
                        for role, need in opp.resource_needs.items():
                            demand[role] += need * opp.probability

        return demand

    def identify_gaps(self, horizon_months: int = 12) -> List[CapacityGap]:
        """Identify capacity gaps over forecast horizon."""
        gaps = []

        for month in range(horizon_months):
            period_start = datetime.now() + timedelta(days=month * 30)
            period_end = period_start + timedelta(days=30)

            capacity = self.get_capacity_at_date(period_start)
            demand = self.calculate_demand(period_start, include_pipeline=True)

            for role in ResourceRole:
                cap = capacity.get(role, 0)
                dem = demand.get(role, 0)
                gap = cap - dem

                if gap < 0:
                    severity = "critical" if gap < -1 else "warning"
                    gaps.append(CapacityGap(
                        role=role,
                        period_start=period_start,
                        period_end=period_end,
                        demand=dem,
                        capacity=cap,
                        gap=gap,
                        severity=severity
                    ))

        return gaps

    def can_pursue_project(self, value: float, start_date: datetime,
                          duration_months: int) -> Dict:
        """Evaluate if organization can pursue new project."""
        # Calculate needs for potential project
        needs = self._calculate_resource_needs(value, ProjectPhase.CONSTRUCTION)
        end_date = start_date + timedelta(days=duration_months * 30)

        # Check capacity over project duration
        can_staff = True
        bottlenecks = []

        current_date = start_date
        while current_date <= end_date:
            capacity = self.get_capacity_at_date(current_date)
            demand = self.calculate_demand(current_date)

            for role, need in needs.items():
                available = capacity.get(role, 0) - demand.get(role, 0)
                if need > available:
                    can_staff = False
                    bottlenecks.append({
                        "date": current_date,
      

Truncated for display — read the full file on GitHub.

Related Skills

View on GitHub
GitHub Stars333
CategoryAutomation