project-sizing-guide
Software project effort estimation assistant. Outputs three-point estimates (optimistic/most-likely/pessimistic values with confidence intervals), T-shirt sizes, or Function Point Analysis (FPA) counts.
Install / Use
npx skills add zebbern/claude-code-guide --skill project-sizing-guideInstalls into whichever agent you are using.
SKILL.md
Installable skill definition
Quality Score
Category
Project & Program ManagementSupported Platforms
Tags
Our assessment of project-sizing-guide
project-sizing-guide scores 94/100 on our quality scale, 3rd of 46 Project & Program Management skills we index (top 7%).
Its SKILL.md is 12 KB long, well organised into 36 sections with 3 code examples: a thorough specification that gives an agent plenty to work with.
With 4,638 GitHub stars, it is one of the more widely adopted skills in the catalogue.
Maintenance, license and trust
- The repository was last updated 2 days ago, so project-sizing-guide is actively maintained.
- It is released under the MIT license, a permissive license that allows use, modification and commercial use with attribution.
- Its trust signals score 100/100, with no cautions. These come from repository metadata, not a code audit — read the skill file before letting an agent act on it.
project-sizing-guide compared with similar skills
All 4 of these similar skills score higher than project-sizing-guide; compare them before choosing.
| Skill | Score | Stars | Updated | Format |
|---|---|---|---|---|
| project-sizing-guide (this skill)by zebbern | 94 | 4.6k | 2d ago | SKILL.md |
| algorithmic-artby anthropics | 100 | 177.9k | 5d ago | SKILL.md |
| pptxby anthropics | 100 | 177.9k | 5d ago | SKILL.md |
| designby nextlevelbuilder | 100 | 130.2k | 7d ago | SKILL.md |
| ui-ux-pro-maxby nextlevelbuilder | 100 | 130.2k | 7d ago | SKILL.md |
Frequently asked questions
- How do I install project-sizing-guide?
- Run
npx skills add zebbern/claude-code-guide --skill project-sizing-guide. The install tabs above show the steps for each supported agent. - Which AI agents does project-sizing-guide work with?
- It is written for Universal, as a SKILL.md file. Other agents that read the same format can often use it too.
- Is project-sizing-guide safe to use?
- It is MIT-licensed and scores 100/100 on trust signals. Skills are instructions an agent will follow, so read the file before installing it and do not approve commands you do not understand.
- Is project-sizing-guide still maintained?
- The repository was last updated 2 days ago, so project-sizing-guide is actively maintained.
Skill content
View source on GitHubname: project-sizing-guide description: "Software project effort estimation assistant. Outputs three-point estimates (optimistic/most-likely/pessimistic values with confidence intervals), T-shirt sizes, or Function Point Analysis (FPA) counts. Triggered when users ask 'how long will this feature take,' need to assess project workload, perform PERT estimation, T-shirt sizing, FPA, sprint planning, or quote-based effort breakdowns." license: MIT
Project Sizing Guide — Software Project Effort Estimation
Helps teams produce scientifically grounded effort estimates for software projects, based on three major methodologies: Three-Point Estimation (PERT), T-shirt Sizing, and Function Point Analysis (FPA). Outputs optimistic, most-likely, and pessimistic values along with risk intervals.
Quick Start
- User provides a requirements description → Agent identifies functional modules and breaks them into a Work Breakdown Structure (WBS)
- Select an estimation method → Choose the best-fit approach based on project stage and available information
- Estimate each item → Assign O/M/P (Optimistic / Most Likely / Pessimistic) values to every work package
- Aggregate and report → Generate an estimation report with risk analysis and confidence intervals
A calculation helper is available:
python3 scripts/estimate_calculator.py --method pert --tasks '[{"name":"User Login","O":2,"M":3,"P":8}]'
Method Selection Guide
| Scenario | Recommended Method | Rationale | |----------|-------------------|-----------| | Early feasibility study, rough budgeting | T-shirt Sizing | Little information available; quickly align on order of magnitude | | Sprint planning, iteration estimation | Three-Point Estimation (PERT) | Good granularity with confidence intervals | | Contract bidding, large-project RFPs | Function Point Analysis (FPA) | Most rigorous; industry-comparable | | Team has historical data | PERT + historical calibration | Combines empirical correction with data |
Method 1: Three-Point Estimation (PERT)
Core Formulas
| Metric | Formula | Meaning | |--------|---------|---------| | Expected Value E | (O + 4M + P) / 6 | Weighted average effort | | Standard Deviation σ | (P − O) / 6 | Estimation uncertainty | | Variance V | σ² | Used to aggregate across tasks | | Project Total Expected | ΣE | Sum of individual expected values | | Project Total Std Dev | √(ΣV) | Square root of summed variances |
Where:
- O (Optimistic): Shortest duration assuming everything goes smoothly
- M (Most Likely): Duration under normal circumstances
- P (Pessimistic): Longest duration when significant difficulties arise
Confidence Intervals
| Confidence Level | Interval | Use Case | |-----------------|----------|----------| | 68.3% | E ± 1σ | Internal rough estimates | | 90% | E ± 1.645σ | Project planning | | 95% | E ± 2σ | External quotes | | 99.7% | E ± 3σ | Contractual commitments |
Steps
- Build the WBS: Decompose requirements into the smallest independently estimable units (recommended ≤ 5 person-days each)
- Three-point estimation: For each work package, provide O / M / P values (use consistent units: person-hours or person-days)
- Calculate per-task expected value and standard deviation
- Aggregate project-level metrics: Total Expected = ΣE, Total Std Dev = √(Σσ²)
- Output confidence intervals: Choose a confidence level based on risk appetite
O/M/P Estimation Rules of Thumb
- O should not be less than 30% of M (overly optimistic suggests essential steps were overlooked)
- P should not exceed 5× M (overly pessimistic suggests unclear requirements that need clarification first)
- If O ≈ M ≈ P, the task is either extremely well-understood or the estimator hasn't seriously considered risks
- The P/O ratio (spread ratio) reflects uncertainty: < 2 = low risk, 2–4 = medium risk, > 4 = high risk
Method 2: T-shirt Sizing
Size Reference Table
| Size | Typical Range (person-days) | Typical Story Points | Suitable For | |------|----------------------------|---------------------|--------------| | XS | 0.25 – 0.5 | 1 | Config changes, copy edits, simple bug fixes | | S | 0.5 – 2 | 2 – 3 | Single-component development, simple API, minor UI tweaks | | M | 2 – 5 | 5 – 8 | Complete feature module, moderately complex API | | L | 5 – 15 | 13 – 21 | Cross-module features requiring integration | | XL | 15 – 40 | 34 – 55 | Subsystem-level development requiring architecture design | | XXL | 40+ | 89+ | Should be split across multiple iterations; not recommended as a single estimation unit |
Converting T-shirt Sizes to Three-Point Estimates
When more precise numbers are needed, T-shirt sizes can be converted to three-point estimates:
| Size | O (person-days) | M (person-days) | P (person-days) | |------|-----------------|-----------------|-----------------| | XS | 0.25 | 0.5 | 1 | | S | 0.5 | 1 | 2.5 | | M | 2 | 3.5 | 7 | | L | 5 | 10 | 20 | | XL | 15 | 25 | 50 | | XXL | 40 | 70 | 150 |
Steps
- Team alignment: Confirm what each size means (the table above is a reference; teams may customize)
- Independent assessment: Each person assigns a size independently to avoid anchoring bias
- Discuss discrepancies: When estimates differ by more than 2 sizes, a discussion is mandatory
- Reach consensus: Adopt the team consensus value
- Convert to numbers (optional): Use the table above to derive O/M/P values
Method 3: Function Point Analysis (FPA)
Five Function Component Types
| Component Type | Abbreviation | Definition | Example | |---------------|-------------|-----------|---------| | Internal Logical File | ILF | Logical data group maintained by the application | Users table, Orders table | | External Interface File | EIF | Data group referenced but not maintained by the application | Third-party exchange rate data | | External Input | EI | Data processing entering the system from outside | Form submission, API POST | | External Output | EO | Data generated and sent outside the system | Report generation, exports | | External Inquiry | EQ | Simple data retrieval + display | List queries, detail pages |
Complexity Weight Matrix
| Component Type | Low | Medium | High | |---------------|-----|--------|------| | ILF | 7 | 10 | 15 | | EIF | 5 | 7 | 10 | | EI | 3 | 4 | 6 | | EO | 4 | 5 | 7 | | EQ | 3 | 4 | 6 |
Complexity Assessment Rules
ILF / EIF Complexity (based on DET – Data Element Types and RET – Record Element Types):
| | DET 1-19 | DET 20-50 | DET 51+ | |---|---------|-----------|---------| | RET 1 | Low | Low | Medium | | RET 2-5 | Low | Medium | High | | RET 6+ | Medium | High | High |
EI Complexity (based on DET and FTR – File Types Referenced):
| | DET 1-4 | DET 5-15 | DET 16+ | |---|---------|----------|---------| | FTR 0-1 | Low | Low | Medium | | FTR 2 | Low | Medium | High | | FTR 3+ | Medium | High | High |
EO / EQ Complexity (based on DET and FTR):
| | DET 1-5 | DET 6-19 | DET 20+ | |---|---------|----------|---------| | FTR 0-1 | Low | Low | Medium | | FTR 2-3 | Low | Medium | High | | FTR 4+ | Medium | High | High |
Converting Function Points to Effort
After calculating Unadjusted Function Points (UFP):
-
Calculate the Value Adjustment Factor (VAF) (optional; deprecated since IFPUG 4.3+ but still used by some teams)
- 14 General System Characteristics (GSC), each scored 0–5
- VAF = 0.65 + 0.01 × Σ(GSC)
- Adjusted Function Points AFP = UFP × VAF
-
Function points to person-hours
- Industry benchmark: 8–15 person-hours per function point (varies by language and team maturity)
| Technology Stack | Person-hours / FP | Notes | |-----------------|-------------------|-------| | Low-code / Mature Frameworks | 4 – 8 | Many reusable components available | | Python / JS / Modern Web | 8 – 12 | Mainstream development productivity | | Java / C# Enterprise | 10 – 15 | Includes architecture and standards overhead | | Embedded / C / C++ | 15 – 25 | High debugging and testing cost | | Legacy System Maintenance | 20 – 30 | Comprehension and regression cost |
Steps
- Identify function components: List all ILFs, EIFs, EIs, EOs, and EQs
- Assess complexity: Rate each component as Low / Medium / High
- Calculate UFP: Sum (count × weight) for all components
- Select conversion factor: Choose person-hours per FP based on technology stack
- Compute total effort: UFP × conversion factor
- Add buffer: A 15–30% management and risk buffer is recommended
Estimation Adjustment Factor Checklist
After completing the estimation, verify that the following factors have been accounted for:
Technical Factors
- [ ] Technology stack familiarity (Is the team experienced? If unfamiliar, add 30–50%)
- [ ] Technical debt (Poor legacy code quality? Add 20–40%)
- [ ] Third-party dependencies (Unstable APIs? Missing documentation? Add 10–30%)
- [ ] Performance / security requirements (Special non-functional requirements? Add 15–25%)
Team Factors
- [ ] Team size (Communication overhead increases significantly above 5 people; add ~5% per person)
- [ ] Personnel turnover risk (Key members may leave? Add 15–25%)
- [ ] Parallel projects (Team context-switching across multiple projects? Add 20–30%)
- [ ] Onboarding new members (New hires? Expect ~50% reduced efficiency for the first 2 weeks)
Process Factors
- [ ] Requirements stability (Requirements likely to change? Add 20–50%)
- [ ] Approval processes (Multiple layers of approval needed? Add 10–20%)
- [ ] Deployment complexity (Multi-environment, multi-region deployments? Add 10–15%)
- [ ] Compliance requirements (Audit or compliance processes? Add 15–30%)
Commonly Underestimated Work
- [ ] Code review: +10–15%
- [ ] Unit test authoring: +15–25%
- [ ] Integration / E2E testing: +10–20%
- [ ] Documentation: +5–15%
- [ ] Bug fixing and regression: +10–20%
- [ ] Environment setup and DevOps: +5–10%
- [ ] Meetings and communication: +10–15%
Estimation Output Template
After the Agent completes the estimation, it should produce output in the following format:
## Estimation Report: [Project / Feature Name]
### Estimation Method: [PERT / T-shirt / FPA]
### Work Package Breakdown
| # | Work Package | O (person-days) | M (person-days) | P (person-days) | E (person-days) | σ |
|---|-------------|-----------------|-----------------|-----------------|-----------------|---|
| 1 | xxx | x | x | x | x.x | x.x |
| 2 | xxx | x | x | x | x.x | x.x |
### Summary
- Total expected effort: X person-days
- Total standard deviation: X person-days
- 68% confidence interval: X – X person-days
- 90% confidence interval: X – X person-days
- 95% confidence interval: X – X person-days
### Adjustment Factors
- [Factors considered and adjustments applied]
### Final Recommendation
- For internal planning: X person-days (90% confidence)
- For external quotes: X person-days (95% confidence)
### Risk Alerts
- [Key risk items and mitigation suggestions]
Calculation Tool
The scripts/estimate_calculator.py script supports numerical calculations for all three estimation methods:
# Three-Point Estimation (PERT)
python3 scripts/estimate_calculator.py --method pert \
--tasks '[{"name":"Login Module","O":2,"M":3,"P":8},{"name":"Payment Module","O":5,"M":10,"P":20}]'
# T-shirt Size Conversion
python3 scripts/estimate_calculator.py --method tshirt \
--tasks '[{"name":"Login Module","size":"M"},{"name":"Payment Module","size":"L"}]'
# Function Point Analysis
python3 scripts/estimate_calculator.py --method fpa \
--components '[{"type":"ILF","complexity":"medium","count":3},{"type":"EI","complexity":"low","count":5}]' \
--hours-per-fp 10
References
- IFPUG
Truncated for display — read the full file on GitHub.
Related Skills
algorithmic-art
177.9kCreating algorithmic art using p5.js with seeded randomness and interactive parameter exploration. Use this when users request creating art using code, generative art, algorithmic art, flow fields, or particle systems.
pptx
177.9kUse this skill any time a .pptx or .potx file is involved in any way — as input, output, or both. This includes: creating slide decks, pitch decks, or presentations; reading, parsing, or extracting text from any .pptx or .potx file (even if the extracted content will be used elsewhere, like in an em…
design
130.2kComprehensive design skill: brand identity, design tokens, UI styling, logo generation (55 styles, Gemini, Atlas Cloud, or MuAPI AI), corporate identity program (50 deliverables, CIP mockups), HTML presentations (Chart.js), banner design (22 styles, social/ads/web/print), icon design (15 styles, SVG…
ui-ux-pro-max
130.2kUI/UX design intelligence for web, mobile, and desktop. This skill should be used when designing, building, reviewing, or fixing interfaces, including pages, components, design systems, accessibility, interaction, responsive layout, typography, color, charts, and stack-specific UI implementation.
Languages
Trust signals
From repository metadata: license, adoption, age and documentation. Not a code audit — see the Safety scan above for what the skill file itself contains.
