SkillAgentSearch skills...

bom-cost-review

Review a bill of materials for cost, risk, and supply exposure — cost rollup, top-10 cost drivers, single-source and EOL risk, MOQ vs forecast mismatch, cost-down candidates, and tariff/logistics sensitivity

Install / Use

npx skills add mohitagw15856/pm-claude-skills --skill bom-cost-review

Installs into whichever agent you are using.

About this skill
📄

SKILL.md

Installable skill definition

Quality Score

82/100

Supported Platforms

Universal

Our assessment of bom-cost-review

bom-cost-review scores 82/100 on our quality scale, 2898th of 4,658 Development & Engineering skills we index.

Its SKILL.md is 4.8 KB long, well organised into 8 sections and no code examples: a solid amount of guidance for an agent.

With 1,396 GitHub stars, it is one of the more widely adopted skills in the catalogue.

Substance
26/30
Structure
13/20
Description
15/15
Adoption
13/20
Freshness
15/15

Maintenance, license and trust

  • The repository was last updated 8 days ago, so bom-cost-review is actively maintained.
  • It is released under the MIT license, a permissive license that allows use, modification and commercial use with attribution.
  • Its trust signals score 100/100, with no cautions. These come from repository metadata, not a code audit — read the skill file before letting an agent act on it.

bom-cost-review compared with similar skills

All 4 of these similar skills score higher than bom-cost-review; compare them before choosing.

SkillScoreStarsUpdatedFormat
bom-cost-review (this skill)by mohitagw15856821.4k8d agoSKILL.md
ai-job-searchby MadsLorentzen10044.8ktodayCLAUDE.md
claude-howtoby luongnv8910041.7k2d agoCLAUDE.md
algorithmic-artby anthropics100177.9k10d agoSKILL.md
pptxby anthropics100177.9k10d agoSKILL.md

Frequently asked questions

How do I install bom-cost-review?
Run npx skills add mohitagw15856/pm-claude-skills --skill bom-cost-review. The install tabs above show the steps for each supported agent.
Which AI agents does bom-cost-review work with?
It is written for Universal, as a SKILL.md file. Other agents that read the same format can often use it too.
Is bom-cost-review safe to use?
It is MIT-licensed and scores 100/100 on trust signals. Skills are instructions an agent will follow, so read the file before installing it and do not approve commands you do not understand.
Is bom-cost-review still maintained?
The repository was last updated 8 days ago, so bom-cost-review is actively maintained.

name: bom-cost-review description: "Review a bill of materials for cost, risk, and supply exposure — cost rollup, top-10 cost drivers, single-source and EOL risk, MOQ vs forecast mismatch, cost-down candidates, and tariff/logistics sensitivity. Use when asked to review a BOM, find cost-down opportunities, check component sourcing risk, or sanity-check BOM cost against target. Produces a structured BOM review with a cost driver Pareto, risk flags per line, and a prioritised cost-down list."

BOM Cost Review Skill

A BOM is a list of promises: that each part will be buyable, at that price, at your volume, for the life of the product. This skill reviews a BOM the way a sourcing veteran does — Pareto the cost, flag the single-source and end-of-life traps before they become line-down events, and separate real cost-down candidates from wishful thinking.

What This Skill Produces

  • A cost rollup by commodity class with % of total
  • Top-10 cost drivers (they usually carry 70–80% of BOM cost)
  • Risk flags per line: single-source, lifecycle (EOL/NRND), MOQ mismatch, long lead time
  • A prioritised cost-down candidate list with realistic savings and effort
  • Tariff and logistics sensitivity notes

Required Inputs

Ask for these if not provided; work with a partial BOM if that's all there is, labelling gaps [missing — request from EE/sourcing]:

  • The BOM — part numbers, descriptions, quantities, unit costs (any format; structure it)
  • Annual forecast volume — needed for MOQ math and price-break realism
  • Target BOM cost — what "good" looks like
  • Sourcing detail if available — approved vendors, country of origin, lead times, lifecycle status
  • Product stage — EVT-stage BOMs get design-out suggestions; MP-stage BOMs get negotiation/resourcing ones

Review Framework

1. Rollup. Group into commodity classes (PCBA/semiconductors, passives, display, battery, mechanicals/enclosure, cables & connectors, packaging & accessories). Show cost and % per class, and total vs target with the gap.

2. Pareto. Rank the top-10 lines by extended cost (unit × qty). Everything after these is noise until the big ten are handled.

3. Risk flags — apply per line, worst flag wins:

| Flag | Trigger | Why it matters | |---|---|---| | 🔴 Single-source | One qualified vendor, no drop-in alternate | One factory fire from line-down | | 🔴 EOL / Obsolete | Lifecycle status EOL or last-time-buy announced | Forced redesign or LTB cash outlay | | 🟠 NRND | Not recommended for new design | Fine now, redesign within product life | | 🟠 MOQ mismatch | MOQ > ~13 weeks of forecast demand | Cash tied up, scrap risk on ECO | | 🟠 Long lead | Lead time > 16 weeks | Forecast error becomes shortage | | 🟡 Custom/tooled part | Custom silicon, tooled mechanical | Switching cost locks the vendor in |

4. Cost-down candidates. For each: the lever (negotiate at volume break / second-source and dual-run / value-engineer spec — e.g. tighter-than-needed tolerance, over-spec'd connector / design-out entirely), estimated saving per unit, effort, and earliest cut-in (which build or ECO).

5. Tariff & logistics sensitivity. Note country of origin concentration, HTS-code exposure for high-value lines, and what a duty change or freight spike does to landed cost.

Output Format

BOM review: [product / revision]

  1. Summary — total BOM cost vs target, gap, one-line verdict
  2. Cost rollup — table by commodity class (cost, % of total)
  3. Top-10 cost drivers — table: part, qty, unit cost, extended cost, % of BOM, flags
  4. Risk register — every 🔴/🟠 line with flag, evidence, and recommended action + owner
  5. Cost-down candidates — ranked table: lever, est. saving/unit, effort, cut-in point, confidence
  6. Tariff/logistics sensitivity — exposure summary and scenarios
  7. Data gaps — lines missing cost, lifecycle, or sourcing data [missing — request]

Quality Checks

  • [ ] Rollup total reconciles with the sum of lines — no silent arithmetic drift
  • [ ] Every top-10 line has a lifecycle and sourcing note, even if [missing — request]
  • [ ] Each cost-down candidate names the lever, the saving, and the cut-in build/ECO
  • [ ] MOQ flags are computed against the stated forecast, not gut feel
  • [ ] Single-source flags distinguish "no alternate exists" from "alternate not yet qualified"

Anti-Patterns

  • [ ] Do not quote unit prices without a volume — a price without its quantity break is fiction
  • [ ] Do not chase pennies on passives while a top-10 line is single-sourced and EOL
  • [ ] Do not claim a cost-down saving without naming the lever and who has to act
  • [ ] Do not treat distributor stock as supply security for a single-source part
  • [ ] Do not ignore custom/tooled parts in risk review — they are the hardest to move
  • [ ] Do not fabricate costs for missing lines — label them and carry the uncertainty into the total

Related Skills

View on GitHub
GitHub Stars1.4k
CategoryDevelopment
Updated8d ago
Forks249

Languages

HTML

Trust signals

100/100

From repository metadata: license, adoption, age and documentation. Not a code audit — see the Safety scan above for what the skill file itself contains.

No cautions