architectural-programme-brief

Turn a client's wishes into an architectural brief that can actually be designed against — the accommodation schedule, the adjacencies, the budget reality, and the constraints named before they become change orders

Install / Use

npx skills add mohitagw15856/pm-claude-skills --skill architectural-programme-brief

Installs into whichever agent you are using.

About this skill
📄

SKILL.md

Installable skill definition

Quality Score

85/100

Supported Platforms

Universal

Our assessment of architectural-programme-brief

architectural-programme-brief scores 85/100 on our quality scale, 1879th of 4,658 Development & Engineering skills we index (top 41%).

Its SKILL.md is 6.1 KB long, well organised into 10 sections and no code examples: a thorough specification that gives an agent plenty to work with.

With 1,396 GitHub stars, it is one of the more widely adopted skills in the catalogue.

Substance
29/30
Structure
13/20
Description
15/15
Adoption
13/20
Freshness
15/15

Maintenance, license and trust

  • The repository was last updated 8 days ago, so architectural-programme-brief is actively maintained.
  • It is released under the MIT license, a permissive license that allows use, modification and commercial use with attribution.
  • Its trust signals score 100/100, with no cautions. These come from repository metadata, not a code audit — read the skill file before letting an agent act on it.

architectural-programme-brief compared with similar skills

All 4 of these similar skills score higher than architectural-programme-brief; compare them before choosing.

SkillScoreStarsUpdatedFormat
architectural-programme-brief (this skill)by mohitagw15856851.4k8d agoSKILL.md
ai-job-searchby MadsLorentzen10044.8ktodayCLAUDE.md
claude-howtoby luongnv8910041.7k2d agoCLAUDE.md
algorithmic-artby anthropics100177.9k10d agoSKILL.md
pptxby anthropics100177.9k10d agoSKILL.md

Frequently asked questions

How do I install architectural-programme-brief?
Run npx skills add mohitagw15856/pm-claude-skills --skill architectural-programme-brief. The install tabs above show the steps for each supported agent.
Which AI agents does architectural-programme-brief work with?
It is written for Universal, as a SKILL.md file. Other agents that read the same format can often use it too.
Is architectural-programme-brief safe to use?
It is MIT-licensed and scores 100/100 on trust signals. Skills are instructions an agent will follow, so read the file before installing it and do not approve commands you do not understand.
Is architectural-programme-brief still maintained?
The repository was last updated 8 days ago, so architectural-programme-brief is actively maintained.

name: architectural-programme-brief description: "Turn a client's wishes into an architectural brief that can actually be designed against — the accommodation schedule, the adjacencies, the budget reality, and the constraints named before they become change orders. Use when asked to write an architectural brief, prepare a project brief for a building, run a client briefing, or capture requirements for a new build or refurbishment. Produces the accommodation schedule with areas, the adjacency and circulation requirements, the site and statutory constraints, the budget and programme reality check, and the explicit exclusions."

Architectural Programme Brief

Clients brief in rooms and adjectives; buildings are designed from areas, adjacencies and constraints. The gap between the two is where scope creep lives. This converts the conversation into a schedule you can design against, tests the budget against the areas before anyone draws anything, and writes down what the project is not — the single most valuable page in any brief.

What This Skill Produces

  • An accommodation schedule — every space with its area, occupancy, and the activity it must support
  • Adjacency and circulation requirements — what must be near what, what must never be, and the routes between
  • Site and statutory constraints — planning context, access, orientation, services, and known designations
  • Performance requirements — servicing, acoustics, daylight, accessibility, and environmental targets, stated as requirements rather than aspirations
  • The budget and programme reality check — the area total against the budget at a realistic rate, before design begins
  • Explicit exclusions — what this project is not doing, agreed and written down

Required Inputs

Ask for these if not provided:

  • The client and the driver — who they are, and what problem the building is supposed to solve
  • The activities — what will actually happen in the building, by whom, and when
  • The site — location, area, existing structures, access, orientation, and any known designations or constraints
  • The budget and programme — the number they have and the date they need it, however soft
  • The fixed points — anything already decided, promised, or non-negotiable

Framework: Activities Before Rooms, Areas Before Budget

  1. Brief the activity, not the room. 'A place for forty people to eat that empties in twenty minutes' designs better than 'a canteen'. Rooms are a solution; activities are the requirement.
  2. Put an area against everything. An unpriced schedule is a wish list. Areas are what make the budget conversation possible.
  3. Test the budget early and bluntly. Total area at a realistic rate per square metre, against the stated budget. If it does not work, say so in the brief rather than discovering it at tender.
  4. Map adjacencies as a matrix. Must-be-near, must-not-be-near, and the routes people take between them. This is where the plan actually comes from.
  5. Name constraints before they become surprises. Planning context, rights of light, access, ground conditions, services capacity, listed status.
  6. Write the exclusions down and get them agreed. The scope you did not include is only excluded if it is on paper.

Deeper Material

  • references/worked-example.md — a community hall whose budget is £461k short of its own accommodation schedule, found before anyone drew a line. Read it when the shape of a good output is unclear, or to calibrate how specific the entries should be.

Output Format

Project brief: [project] · [client] · [date] · rev [n]

Project driver: [the problem the building solves, in one paragraph]

Accommodation schedule | Space | Activity supported | Area (m²) | Occupancy | Key requirements | |---|---|---|---|---| | | | | | | Net area: [x] m² · Gross (at [n]% circulation/plant): [y] m²

Adjacencies: must be adjacent [pairs] · must be separated [pairs] · key routes [list]

Site & statutory: [location, area, access, orientation, existing structures, designations, planning context, known constraints]

Performance: accessibility [standard] · environmental target [standard/rating] · acoustics [where it matters] · daylight [requirement] · servicing strategy [outline]

Budget check: [y] m² × [rate]/m² = [construction cost estimate] vs stated budget [amount] → [aligned / gap of [amount]] If there is a gap: [the options — reduce area, change specification, phase, or increase budget]

Programme: [key dates, and whether they are achievable against a realistic consent and construction period]

Explicitly excluded: [what this project does not include — agreed with client on [date]]

Assumptions: [what has been assumed pending information, and what would change if wrong]

Quality Checks

  • [ ] Every space is justified by an activity, not just named
  • [ ] Areas are stated and totalled, gross as well as net
  • [ ] The budget is tested against the area before design begins
  • [ ] Adjacencies are recorded as requirements, not left to the plan
  • [ ] Statutory and site constraints are named rather than assumed away
  • [ ] Exclusions are written down and agreed
  • [ ] Assumptions are flagged with what changes if they turn out wrong

Anti-Patterns

  • Briefing in room names. Locks in a solution before the requirement is understood.
  • A schedule with no areas. Guarantees the budget conversation happens after the design.
  • Deferring the budget test. The gap does not shrink by being discovered later; it just costs more to fix.
  • Aspirations written as requirements. 'Sustainable' is not a requirement; a target rating is.
  • No exclusions page. Every undocumented exclusion becomes a variation.
  • Accepting a programme without testing it. Consent periods are not negotiable by optimism.

Example Trigger Phrases

  • "Write an architectural brief for a new community building"
  • "Help me capture what the client actually needs"
  • "Turn these client notes into a project brief"
  • "Does this budget work for the accommodation they are asking for?"
  • "Write a brief for a house extension"

Related Skills

View on GitHub
GitHub Stars1.4k
CategoryDevelopment
Updated8d ago
Forks249

Languages

HTML

Trust signals

100/100

From repository metadata: license, adoption, age and documentation. Not a code audit — see the Safety scan above for what the skill file itself contains.

No cautions