SkillAgentSearch skills...

devops-rollout-plan

Generate comprehensive rollout plans with preflight checks, step-by-step deployment, verification signals, rollback procedures, and communication plans for infrastructure and application changes

Install / Use

npx skills add github/awesome-copilot --skill devops-rollout-plan

Installs into whichever agent you are using.

About this skill
📄

SKILL.md

Installable skill definition

Quality Score

88/100

Category

Operations

Supported Platforms

Universal

Tags

Our assessment of devops-rollout-plan

devops-rollout-plan scores 88/100 on our quality scale, 377th of 745 Operations skills we index.

Its SKILL.md is 3.9 KB long, well organised into 19 sections and no code examples: a solid amount of guidance for an agent.

With 39,348 GitHub stars, it is one of the more widely adopted skills in the catalogue.

Substance
26/30
Structure
13/20
Description
15/15
Adoption
20/20
Freshness
15/15

Maintenance, license and trust

  • The repository was last updated about 2 months ago, so devops-rollout-plan is actively maintained.
  • Our last check on 2026-10-31 found the source still online.
  • It is released under the MIT license, a permissive license that allows use, modification and commercial use with attribution.
  • Its trust signals score 100/100, with no cautions. These come from repository metadata, not a code audit — read the skill file before letting an agent act on it.

Safety scan

No issues found

Our scan of the whole file found no instruction hijacking, hidden characters, credential access, data exfiltration or destructive commands. An AI review of the same text found nothing harmful.

AI review by kimi-k2.7-code on 2026-09-26. Automated pattern scan on 2026-09-25. It catches known dangerous patterns, not every risk — read a skill before letting an agent act on it.

devops-rollout-plan compared with similar skills

All 4 of these similar skills score higher than devops-rollout-plan; compare them before choosing.

SkillScoreStarsUpdatedFormat
devops-rollout-plan (this skill)by github8839.3k53d agoSKILL.md
x402by browser-use100121.0k3d agoSKILL.md
algorithmic-artby anthropics100177.9k55d agoSKILL.md
pptxby anthropics100177.9k55d agoSKILL.md
designby nextlevelbuilder100149.0k6d agoSKILL.md

Frequently asked questions

How do I install devops-rollout-plan?
Run npx skills add github/awesome-copilot --skill devops-rollout-plan. The install tabs above show the steps for each supported agent.
Which AI agents does devops-rollout-plan work with?
It is written for Universal, as a SKILL.md file. Other agents that read the same format can often use it too.
Is devops-rollout-plan safe to use?
Our scan of the whole file found no instruction hijacking, hidden characters, credential access, data exfiltration or destructive commands. An AI review of the same text found nothing harmful. It is MIT-licensed and scores 100/100 on trust signals. Skills are instructions an agent will follow, so read the file before installing it and do not approve commands you do not understand.
Is devops-rollout-plan still maintained?
The repository was last updated about 2 months ago, so devops-rollout-plan is actively maintained.

name: devops-rollout-plan description: 'Generate comprehensive rollout plans with preflight checks, step-by-step deployment, verification signals, rollback procedures, and communication plans for infrastructure and application changes'

DevOps Rollout Plan Generator

Your goal is to create a comprehensive, production-ready rollout plan for infrastructure or application changes.

Input Requirements

Gather these details before generating the plan:

Change Description

  • What's changing (infrastructure, application, configuration)
  • Version or state transition (from/to)
  • Problem solved or feature added

Environment Details

  • Target environment (dev, staging, production, all)
  • Infrastructure type (Kubernetes, VMs, serverless, containers)
  • Affected services and dependencies
  • Current capacity and scale

Constraints & Requirements

  • Acceptable downtime window
  • Change window restrictions
  • Approval requirements
  • Regulatory or compliance considerations

Risk Assessment

  • Blast radius of change
  • Data migrations or schema changes
  • Rollback complexity and safety
  • Known risks

Output Format

Generate a structured rollout plan with these sections:

1. Executive Summary

  • What, why, when, duration
  • Risk level and rollback time
  • Affected systems and user impact
  • Expected downtime

2. Prerequisites & Approvals

  • Required approvals (technical lead, security, compliance, business)
  • Required resources (capacity, backups, monitoring, rollback automation)
  • Pre-deployment backups

3. Preflight Checks

  • Infrastructure health validation
  • Application health baseline
  • Dependency availability
  • Monitoring baseline metrics
  • Go/no-go decision checklist

4. Step-by-Step Rollout Procedure

Phases: Pre-deployment, deployment, progressive verification

  • Specific commands for each step
  • Validation after each step
  • Duration estimates

5. Verification Signals

Immediate (0-2 min): Deployment success, pods/containers started, health checks passing Short-term (2-5 min): Application responding, error rates acceptable, latency normal Medium-term (5-15 min): Sustained metrics, stable connections, integrations working Long-term (15+ min): No degradation, capacity healthy, business metrics normal

6. Rollback Procedure

Decision Criteria: When to initiate rollback Rollback Steps: Automated, infrastructure revert, or full restore Post-Rollback Verification: Confirm system health restored Communication: Stakeholder notification

7. Communication Plan

  • Pre-deployment (T-24h): Schedule and impact notice
  • Deployment start: Commencement notice
  • Progress updates: Status every X minutes
  • Completion: Success confirmation
  • Rollback (if needed): Issue notification

Stakeholder Matrix: Who to notify, when, via what method, with what content

8. Post-Deployment Tasks

  • Immediate (1h): Verify criteria met, review logs
  • Short-term (24h): Monitor metrics, review errors
  • Medium-term (1 week): Post-deployment review, lessons learned

9. Contingency Plans

Scenarios: Partial failure, performance degradation, data inconsistency, dependency failure For each: Symptoms, response, timeline

10. Contact Information

  • Primary and secondary on-call
  • Escalation path
  • Emergency contacts (infrastructure, security, database, networking)

Plan Customization

Adapt based on:

  • Infrastructure Type: Kubernetes, VMs, serverless, databases
  • Risk Level: Low (simplified), medium (standard), high (additional gates)
  • Change Type: Code deployment, infrastructure, configuration, data migration
  • Environment: Production (full plan), staging (simplified), development (minimal)

Remember

  • Always have a tested rollback plan
  • Communicate early and often
  • Monitor metrics, not just logs
  • Document everything
  • Learn from each deployment
  • Never deploy on Friday afternoon (unless critical)
  • Never skip verification steps
  • Never assume "it should work"

Related Skills

View on GitHub
GitHub Stars39.3k
CategoryOperations
Updated1mo ago
Forks5.0k

Languages

JavaScript

Trust signals

100/100

From repository metadata: license, adoption, age and documentation. Not a code audit — see the Safety scan above for what the skill file itself contains.

No cautions