SkillAgentSearch skills...

igce-builder-lh-tm

Trigger for: Labor-Hour IGCE, LH estimate, Time-and-Materials IGCE, T&M estimate, burdened hourly rate, burden multiplier, labor-category ceiling hours, materials estimate, proposed LH/T&M rate validation, price-reasonableness memo, or fair-and-reasonable analysis.

Install / Use

npx skills add aiskillstore/marketplace --skill igce-builder-lh-tm

Installs into whichever agent you are using.

About this skill
📄

SKILL.md

Installable skill definition

Quality Score

89/100

Supported Platforms

Universal

Tags

Our assessment of igce-builder-lh-tm

igce-builder-lh-tm scores 89/100 on our quality scale, 1729th of 4,717 Development & Engineering skills we index (top 37%).

Its SKILL.md is 16 KB long, well organised into 27 sections with 2 code examples: a thorough specification that gives an agent plenty to work with.

It has 428 GitHub stars, a meaningful sign that others use it.

Substance
30/30
Structure
18/20
Description
15/15
Adoption
11/20
Freshness
15/15

Maintenance, license and trust

  • The repository was last updated about 2 months ago, so igce-builder-lh-tm is actively maintained.
  • Our last check on 2026-10-31 found the source still online.
  • No license is declared. By default that means all rights are reserved: you can read it, but reusing or redistributing it is not clearly permitted. Ask the author before building on it commercially.
  • Its trust signals score 88/100, with 1 caution from licensing, adoption, age or documentation. These come from repository metadata, not a code audit — read the skill file before letting an agent act on it.

Safety scan

No issues found

Our scan of the whole file found no instruction hijacking, hidden characters, credential access, data exfiltration or destructive commands. An AI review of the same text found nothing harmful.

AI review by kimi-k2.7-code on 2026-10-07. Automated pattern scan on 2026-10-07. It catches known dangerous patterns, not every risk — read a skill before letting an agent act on it.

igce-builder-lh-tm compared with similar skills

All 4 of these similar skills score higher than igce-builder-lh-tm; compare them before choosing.

SkillScoreStarsUpdatedFormat
igce-builder-lh-tm (this skill)by aiskillstore8942855d agoSKILL.md
taste-skillby Leonxlnx100118.3k10d agoCLAUDE.md
hyperframesby heygen-com10086.4ktodayCLAUDE.md
ai-job-searchby ai-job-search-dev10072.4ktodayCLAUDE.md
claude-howtoby luongnv8910047.4k4d agoCLAUDE.md

Frequently asked questions

How do I install igce-builder-lh-tm?
Run npx skills add aiskillstore/marketplace --skill igce-builder-lh-tm. The install tabs above show the steps for each supported agent.
Which AI agents does igce-builder-lh-tm work with?
It is written for Universal, as a SKILL.md file. Other agents that read the same format can often use it too.
Is igce-builder-lh-tm safe to use?
Our scan of the whole file found no instruction hijacking, hidden characters, credential access, data exfiltration or destructive commands. An AI review of the same text found nothing harmful. It declares no license and scores 88/100 on trust signals. Skills are instructions an agent will follow, so read the file before installing it and do not approve commands you do not understand.
Is igce-builder-lh-tm still maintained?
The repository was last updated about 2 months ago, so igce-builder-lh-tm is actively maintained.

name: igce-builder-lh-tm description: > Trigger for: Labor-Hour IGCE, LH estimate, Time-and-Materials IGCE, T&M estimate, burdened hourly rate, burden multiplier, labor-category ceiling hours, materials estimate, proposed LH/T&M rate validation, price-reasonableness memo, or fair-and-reasonable analysis. Build auditable LH/T&M estimates using BLS OEWS wages, explicit burden multipliers, GSA CALC+ positioning, GSA Per Diem travel, and separately priced T&M materials. Do NOT use for FFP, cost-reimbursement, grants, or cooperative agreements. Requires the bls-oews, gsa-calc, and gsa-perdiem MCP servers.

IGCE Builder: Labor-Hour and Time-and-Materials

Overview

Build an auditable Labor-Hour or Time-and-Materials Independent Government Cost Estimate. Both contract types use fixed hourly rates that include wages, overhead, G&A, and profit. T&M also reimburses materials at actual cost, subject to the contract and applicable indirect-cost treatment; LH does not include a materials-reimbursement component.

Regulatory anchors: FAR 15.404-1, FAR 16.600 and 16.601, FAR 31.205-26, and FAR 52.232-7. Apply the current regulation, solicitation, clauses, and agency supplement. This skill does not prepare the Determination and Findings required to use T&M/LH or make legal determinations.

Load supporting files only when needed:

Operating principle

This skill assembles data and formats analysis. The Contracting Officer owns fair-and-reasonable determinations, contract-type decisions, the T&M/LH Determination and Findings, ceiling price, surveillance approach, negotiation positions, and approval documents.

  • Use neutral positional language such as at CALC+ P77 (n=42) or above P50 by 18%.
  • Never originate a determination, negotiation target, evaluation notice, or responsibility conclusion.
  • Never invent clearance, SCIF, OCONUS, or specialty-labor premiums.
  • Preserve user-supplied rationale and conclusions verbatim and label any resulting document DRAFT.

Permanent correctness gates

  1. Workflow B boundary: On every Workflow B entry, emit the Option A/Option B boundary before analysis or tool use and wait.
  2. CALC+ signature: Use /v3/api/ceilingrates/ with keyword=. Never use q=; it silently returns the full corpus.
  3. Contract type: Do not silently default an unspecified requirement to LH or T&M. Explain the structural difference and require the user to choose.
  4. Labor-rate content: Fixed hourly rates include wages, overhead, G&A, and profit. Apply the burden multiplier to labor only.
  5. Materials basis: T&M materials include direct materials, certain subcontracts, ODCs such as travel or computer usage, and applicable indirect costs. Price at actual cost subject to FAR 16.601 and 52.232-7. Never add labor burden or an arbitrary material-handling profit percentage.
  6. Material handling: Include only indirect costs clearly excluded from hourly labor rates and allocated to direct materials under the contractor's usual accounting practices. Treat them as cost, not fee. Use zero unless the user supplies a solicitation or accounting basis.
  7. Ceilings: Show labor-category ceiling hours and a total ceiling-price input. Do not present the IGCE total as the binding contract ceiling unless the user confirms that decision.
  8. Aging formula: Store BLS vintage and contract start as YYYY-MM. Calculate month gap with VALUE, LEFT, and MID; do not use YEAR on text or rely on DATEDIF portability.
  9. Shift coverage: Derive FTE from coverage hours and productive hours. At 1,880 hours, one 24x7x365 seat is 4.6596 FTE. Do not multiply 4.2 by 1,880.
  10. Staged questions: Stage A is decomposition confirmation only. It must end immediately after that question, with no Stage B preview.
  11. Step 8.5: Run formula-structure audit, independent recomputation, and real-engine verification when available. Disclose when formula execution was not independently verified.
  12. Credentialed API pacing: Serialize credentialed federal API calls and leave at least three seconds after one completes before starting the next. Never parallelize keyed calls. Honor longer retry intervals and stop instead of rapid retrying.

Workflow selection

Select the workflow before capability tests.

Workflow A-LH: structured Labor-Hour build

Use when the user declares LH and supplies structured labor inputs. Include no reimbursable-materials component.

Workflow A-TM: structured Time-and-Materials build

Use when the user declares T&M. Build labor and materials as separate cost streams. Travel and computer usage are within the FAR definition of materials for T&M treatment.

Workflow A+: SOW/PWS build or approved handoff

Use for raw requirements or the approved staffing handoff from sow-pws-builder. For raw requirements, run Step 0 and both staged confirmations. For an approved handoff, preserve it and skip decomposition and Stage A.

If the requirement does not specify LH or T&M, do not decide from the presence of materials alone. Explain that LH excludes reimbursable materials while T&M includes them, then ask the user to select the contemplated type.

Workflow B: rate positioning or memo request

Use when the user asks to validate proposed rates, compare vendor pricing, draft a price-reasonableness memo, or decide whether rates are fair and reasonable.

The entire first response must be exactly this boundary. Add no heading, workflow label, preamble, capability note, analysis, or tool call. End at the question:

I can provide positioning data showing where proposed rates sit against CALC+ ceiling rates and BLS market wages. I cannot originate a price-reasonableness memo, fair-and-reasonable determination, T&M/LH Determination and Findings, or negotiation position. Those are Contracting Officer decisions.

Option A: Positioning data only. I provide per-category CALC+ percentiles and sample size, BLS metro burdened equivalents, and neutral arithmetic. No verdict or recommendation.

Option B: Draft template using your conclusion. You provide your rationale and determination. I place that text verbatim into a DRAFT template and add benchmark tables. I do not add conclusions or negotiation advice.

Which option do you choose?

After Option A, run the applicable BLS and CALC+ steps and stop at neutral positioning. After Option B, require both rationale and determination. Never paraphrase the user's conclusion.

Pre-flight capabilities

Run after workflow selection and, for Workflow B, only after the user chooses an option.

  1. Inspect available operations and match by server and schema, not generated namespace.
  2. Builds require BLS wage, vintage, SOC, and metro operations plus CALC+ discovery and benchmark operations. Add Per Diem only when travel is in scope.
  3. Workflow B requires only the benchmark operations needed for the selected option.
  4. Before workbook creation, require .xlsx authoring, Python 3.10+, openpyxl, and the bundled validators. A real spreadsheet engine is preferred but optional when absence is disclosed.
  5. Test only capabilities the active workflow will use. Confirm BLS vintage for every build. Apply the pacing gate to keyed calls.
  6. If an operation is unavailable, look for an equivalent operation from the declared server. Do not bypass the MCP with a hand-built API call.
  7. If a capability remains missing, stop and report whether it appears uninstalled, unauthenticated, or unavailable in the host.

Information to collect

Required:

  • Contract type: LH or T&M.
  • Labor categories or disciplines, SOC when known, seniority, location, FTE, productive hours, and ceiling hours by category.
  • Base and option periods, contract start month, and partial-year duration.
  • Burden-multiplier basis or user-supplied fully burdened rates.
  • Total ceiling-price input or confirmation that the workbook total is only an estimate.
  • For T&M, each materials category, cost basis, escalation, and applicable indirect material-handling basis.

Optional with disclosed defaults:

  • Productive hours 1,880; escalation 2.5%; burden scenarios 1.8x, 2.0x, and 2.2x.
  • No travel and no T&M materials. Use numeric zero and state that each was considered.
  • No material-handling indirect cost unless supported by user-supplied accounting or solicitation terms.

User-supplied productive hours control. If total hours and FTE are supplied without productive hours, back-solve total hours / FTE and flag deviations above 5% from the 1,880 default. Never hardcode 1,880 into annual formulas when the assumption cell exists.

Approved SOW/PWS handoff

Treat a user-reviewed STAFFING HANDOFF TABLE as approved input regardless of heading punctuation.

  1. Consume only LH/T&M CLINs. Route FFP and CR CLINs to their skills.
  2. Preserve labor category, SOC, FTE, phase, hours, notes, derivation, and overrides.
  3. Use the CLIN handoff for period mapping.
  4. Present contradictions in a short table and wait for the user to identify the controlling value.
  5. Ask all missing Stage B fields in one response. Do not rerun decomposition or Stage A unless the user asks to revise staffing.

Orchestration

Step 0: decompose raw requirements

  1. Check labor disciplines, staffing basis, location, period, deliverables, travel, and non-labor costs. Performance location is a hard stop before wage calls.
  2. Separate tasks by discipline, complexity, cadence, deliverable, and staffing basis.
  3. Perform domain triage before SOC mapping.
  4. Map candidate categories and SOCs using data-source-operations.md.
  5. Estimate FTE ranges only when the requirement supplies a defensible sizing basis. Otherwise list the missing facts.
  6. Stage A: Ask only whether the user confirms or amends the task areas, labor categories, and SOC mappings. This must be the only question. Do not ask for contract type, location, burden, materials, ceiling, or other Stage B data. End immediately after the confirmation question.
  7. Stage B: After approval, batch LH/T&M selection, multiplier basis, location, start, period, productive and ceiling hours, ceiling price, travel, materials, material-handling basis, NAICS/PSC, and coverage. End at the question and wait.

Skip both stages only for complete structured inputs.

Step 0.5: convert coverage to staffing

annual coverage hours = covered seats * hours per day * coverage days per year
coverage FTE = annual coverage hours / productive hours per FTE

At 1,880 hours, one 24x7x365 seat is 4.6596 FTE; two seats are 9.3191. One 8x5x52 seat is 1.1064. Keep four decimals in calculations, disclose rounding, and add overlap or backfill only with a separate approved basis.

Step 1: map labor categories to SOCs

Use data-source-operations.md. Map program managers by domain. Use BLS P25/P50/P75 for junior/mid/senior. Preserve user-approved mappings and record alternate SOCs when ambiguity materially changes the estimate.

Step 2: pull and age BLS wages

  1. Call detect_latest_year and record the runtime vintage.
  2. Resolve the current metro before querying. Fall back metro to state to national only when needed and disclose each fallback.
  3. Pull the full wage distribution and flag capped or compressed tails.
  4. Calculate aging from the runtime vintage to contract start and store every assumption in th

Truncated for display — read the full file on GitHub.

Related Skills

View on GitHub
GitHub Stars428
CategoryDevelopment
Updated1mo ago
Forks45

Languages

Python

Trust signals

88/100

From repository metadata: license, adoption, age and documentation. Not a code audit — see the Safety scan above for what the skill file itself contains.

1 medium