afrexai-construction-estimator
Complete construction estimating and cost management system
Install / Use
npx skills add LeoYeAI/openclaw-master-skills --skill afrexai-construction-estimatorInstalls into whichever agent you are using.
SKILL.md
Installable skill definition
Quality Score
Category
OperationsSupported Platforms
Tags
Our assessment of afrexai-construction-estimator
afrexai-construction-estimator scores 83/100 on our quality scale, 602nd of 745 Operations skills we index.
Its SKILL.md is 24 KB long, well organised into 49 sections with 13 code examples: a thorough specification that gives an agent plenty to work with.
With 2,149 GitHub stars, it is one of the more widely adopted skills in the catalogue.
Maintenance, license and trust
- The repository was last updated about 4 months ago. That is recent enough to be usable, but agent tooling moves fast, so check the instructions against your agent's current version.
- Our last check on 2026-11-07 found the source still online.
- It is released under the MIT license, a permissive license that allows use, modification and commercial use with attribution.
- Its trust signals score 98/100, with no cautions. These come from repository metadata, not a code audit โ read the skill file before letting an agent act on it.
Safety scan
No issues foundOur scan of the whole file found no instruction hijacking, hidden characters, credential access, data exfiltration or destructive commands. An AI review of the same text found nothing harmful.
AI review by kimi-k2.7-code on 2026-10-01. Automated pattern scan on 2026-10-01. It catches known dangerous patterns, not every risk โ read a skill before letting an agent act on it.
afrexai-construction-estimator compared with similar skills
All 4 of these similar skills score higher than afrexai-construction-estimator; compare them before choosing.
| Skill | Score | Stars | Updated | Format |
|---|---|---|---|---|
| afrexai-construction-estimator (this skill)by LeoYeAI | 83 | 2.1k | 4mo ago | SKILL.md |
| x402by browser-use | 100 | 121.0k | 3d ago | SKILL.md |
| algorithmic-artby anthropics | 100 | 177.9k | 55d ago | SKILL.md |
| pptxby anthropics | 100 | 177.9k | 55d ago | SKILL.md |
| designby nextlevelbuilder | 100 | 149.0k | 6d ago | SKILL.md |
Frequently asked questions
- How do I install afrexai-construction-estimator?
- Run
npx skills add LeoYeAI/openclaw-master-skills --skill afrexai-construction-estimator. The install tabs above show the steps for each supported agent. - Which AI agents does afrexai-construction-estimator work with?
- It is written for Universal, as a SKILL.md file. Other agents that read the same format can often use it too.
- Is afrexai-construction-estimator safe to use?
- Our scan of the whole file found no instruction hijacking, hidden characters, credential access, data exfiltration or destructive commands. An AI review of the same text found nothing harmful. It is MIT-licensed and scores 98/100 on trust signals. Skills are instructions an agent will follow, so read the file before installing it and do not approve commands you do not understand.
- Is afrexai-construction-estimator still maintained?
- The repository was last updated about 4 months ago. That is recent enough to be usable, but agent tooling moves fast, so check the instructions against your agent's current version.
Skill content
View source on GitHubname: afrexai-construction-estimator description: "Complete construction estimating and cost management system. Use when preparing project estimates, bid proposals, cost breakdowns, value engineering, change order management, or construction budget tracking. Covers residential, commercial, and infrastructure projects. Trigger on 'estimate', 'construction cost', 'bid', 'takeoff', 'cost breakdown', 'change order', 'value engineering', 'construction budget', 'unit pricing', 'RSMeans'."
Construction Estimator Pro
Complete construction estimating methodology โ from quantity takeoff to bid submission. Zero dependencies.
Phase 1: Project Classification & Estimate Type
Estimate Type Decision Matrix
| Project Stage | Estimate Type | Accuracy | Basis | Use Case | |---|---|---|---|---| | Concept | Order of Magnitude | -30% to +50% | SF/unit costs | Go/no-go decisions | | Schematic | Conceptual/Budget | -15% to +30% | Assembly costs | Budget approval | | Design Dev | Detailed | -10% to +15% | Quantity takeoff | GMP/bid preparation | | Construction Docs | Definitive/Bid | -5% to +10% | Full QTO + subs | Lump sum bid | | Construction | Control | Actual costs | Committed + forecast | Cost management |
Project Brief YAML
project:
name: ""
number: ""
type: residential | commercial | industrial | infrastructure | renovation
delivery: design-bid-build | design-build | CM-at-risk | IPD
location:
city: ""
state: ""
zip: ""
location_factor: 1.00 # RSMeans city cost index / national average
owner: ""
architect: ""
scope:
gross_sf: 0
stories: 0
site_acres: 0
description: ""
schedule:
bid_date: ""
construction_start: ""
substantial_completion: ""
duration_months: 0
estimate:
type: order-of-magnitude | conceptual | detailed | definitive
base_date: "" # Date costs are based on
escalation_rate: 0.04 # Annual construction cost escalation
assumptions:
- ""
exclusions:
- ""
allowances:
- item: ""
amount: 0
Project Type Quick Reference
| Type | Key Considerations | Typical $/SF Range (2024-2026) | |---|---|---| | Single Family Residential | Foundation type, finishes grade, energy code | $150-$400/SF | | Multi-Family | Unit mix, parking ratio, amenities | $200-$450/SF | | Office (Class A) | Curtain wall, MEP density, TI allowance | $250-$550/SF | | Retail | Shell vs TI, storefront, grease traps | $150-$350/SF | | Healthcare/Hospital | Life safety, med gas, shielding | $400-$900/SF | | K-12 Education | Prevailing wage, hazmat, phasing | $300-$600/SF | | Warehouse/Distribution | Clear height, slab flatness, dock count | $80-$180/SF | | Hotel | Star rating drives finish, FF&E budget | $200-$500/SF | | Infrastructure (road/mile) | Soil conditions, utilities, traffic control | $2M-$10M/mile |
Phase 2: Quantity Takeoff (QTO)
CSI MasterFormat Division Structure
Use CSI MasterFormat 2018 for ALL estimates. Every line item maps to a division.
| Division | Name | Typical % of Total | |---|---|---| | 01 | General Requirements | 8-12% | | 02 | Existing Conditions | 1-5% | | 03 | Concrete | 8-15% | | 04 | Masonry | 2-6% | | 05 | Metals (Structural Steel) | 8-15% | | 06 | Wood, Plastics, Composites | 3-8% | | 07 | Thermal & Moisture Protection | 4-8% | | 08 | Openings (Doors/Windows) | 3-7% | | 09 | Finishes | 8-15% | | 10 | Specialties | 1-3% | | 11 | Equipment | 1-5% | | 12 | Furnishings | 1-5% | | 13 | Special Construction | 0-3% | | 14 | Conveying Equipment (Elevators) | 1-4% | | 21 | Fire Suppression | 2-4% | | 22 | Plumbing | 4-8% | | 23 | HVAC | 8-15% | | 26 | Electrical | 8-15% | | 27 | Communications | 1-3% | | 28 | Electronic Safety & Security | 1-3% | | 31 | Earthwork | 3-8% | | 32 | Exterior Improvements | 2-6% | | 33 | Utilities | 2-5% |
QTO Best Practices
- Measure twice, price once โ QTO errors cascade through the entire estimate
- Use consistent units โ SF for areas, LF for linear, CY for volume, EA for items
- Add waste factors by material:
- Concrete: 5-8%
- Masonry: 3-5%
- Drywall: 10-12%
- Roofing: 8-10%
- Flooring (tile): 10-15%
- Lumber: 8-10%
- Rebar: 5-7%
- Paint: 10-15%
- Document measurement methodology โ so anyone can verify
- Cross-check totals โ SF of drywall โ 2.5-3x floor area (both sides of walls + ceilings)
QTO Line Item Template
line_item:
division: "03"
spec_section: "03 30 00"
description: "Cast-in-Place Concrete - Elevated Slabs"
quantity: 450
unit: CY
unit_cost:
labor: 85.00
material: 165.00
equipment: 25.00
subcontractor: 0.00
total_unit_cost: 275.00
extended_cost: 123750.00
waste_factor: 0.07
adjusted_quantity: 481.5
notes: "4500 PSI, #5 rebar @ 12\" OC EW, 6\" slab"
source: "Sub quote - ABC Concrete (02/15/2026)"
confidence: high | medium | low
Quantity Verification Cross-Checks
| Check | Formula | Flag If | |---|---|---| | Concrete per SF | Total CY รท Building SF | >0.15 CY/SF (unless heavy structure) | | Steel per SF | Total tons รท Building SF | >15 PSF (unless high-rise) | | Drywall SF | Total drywall SF รท Floor SF | <2.0 or >4.0 ratio | | Electrical per SF | Electrical $ รท Building SF | >$35/SF (standard office) | | Plumbing fixtures | Count vs occupancy | Missing fixtures for code compliance | | Parking spaces | Per local code requirements | Below minimum ratio |
Phase 3: Pricing & Cost Assembly
Unit Cost Development
Cost source hierarchy (most reliable first):
- Subcontractor quotes (3 minimum per trade) โ best for bid estimates
- Historical project data โ adjusted for location, time, scope
- RSMeans/Gordian data โ industry standard reference
- Vendor quotes โ for specific materials/equipment
- Published cost guides โ Marshall & Swift, Craftsman
Labor Cost Build-Up
labor_rate_build_up:
trade: "Carpenter"
base_wage: 42.50
fringe_benefits: 18.75 # Health, pension, vacation, training
payroll_taxes: 8.90 # FICA, FUTA, SUTA, workers comp
total_burden: 27.65
burdened_rate: 70.15
productivity_factors:
weather: 1.00 # 1.0 = normal, 1.15 = winter
overtime: 1.00 # 1.0 = straight time, 1.5 = OT
height: 1.00 # 1.0 = ground, 1.10 = >30ft
congestion: 1.00 # 1.0 = open, 1.15 = tight
shift: 1.00 # 1.0 = day, 1.10 = swing, 1.15 = night
adjusted_rate: 70.15
Subcontractor Quote Evaluation
Score each sub quote (use minimum 3 per trade):
| Factor | Weight | 1-5 Score | |---|---|---| | Price competitiveness | 30% | | | Scope completeness (covers all spec sections?) | 25% | | | Qualifications/exclusions (red flags?) | 20% | | | Past performance/reputation | 15% | | | Bond capacity/insurance | 10% | | | Weighted Total | 100% | |
Red flags in sub quotes:
- "As needed" or "TBD" line items (scope gap)
- Short validity period (<30 days)
- Unusual exclusions (e.g., electrician excluding wire)
- No reference to spec sections
- Price significantly below others (they missed something)
Crew Rate Assembly
Crew Daily Cost = ฮฃ(Workers ร Daily Rate) + Equipment Daily Cost
Crew Daily Output = Units per 8-hour day (from labor standards)
Unit Cost = Crew Daily Cost รท Crew Daily Output
Example โ Concrete Placement Crew:
- 1 Foreman @ $75/hr ร 8 = $600
- 4 Laborers @ $55/hr ร 8 = $1,760
- 1 Vibrator operator @ $60/hr ร 8 = $480
- Concrete pump (daily rental) = $1,200
- Crew Daily Cost = $4,040
- Daily output: 50 CY
- Unit Labor+Equipment Cost = $80.80/CY
- Material (concrete delivered) = $165/CY
- Total in-place cost = $245.80/CY
Phase 4: Indirect Costs & Markups
General Conditions (Division 01) Checklist
| Item | Duration-Based? | Typical Range | |---|---|---| | Project Manager | Yes | $12K-$18K/month | | Superintendent | Yes | $10K-$16K/month | | Project Engineer | Yes | $8K-$12K/month | | Field Office (trailer) | Yes | $1K-$3K/month | | Temporary utilities | Yes | $2K-$5K/month | | Temporary toilets | Yes | $200-$500/month each | | Dumpsters/waste removal | Yes | $1K-$4K/month | | Safety equipment/supplies | Yes | $500-$2K/month | | Small tools & consumables | Lump | 1-2% of labor | | Final cleaning | Lump | $0.15-$0.50/SF | | Permits (building) | Lump | Varies by jurisdiction | | Insurance (Builder's Risk) | Lump | 0.5-1.5% of cost | | Performance/Payment Bond | Lump | 1-3% of contract | | Testing & inspection | Lump | 0.5-1.5% of cost | | As-built documentation | Lump | $5K-$25K | | Commissioning support | Lump | $10K-$50K |
Rule of thumb: General conditions = 8-15% of direct costs (lower for large projects, higher for small/complex).
Markup Stack
markup_calculation:
direct_costs: 2500000
general_conditions:
percentage: 0.10
amount: 250000
subtotal_1: 2750000
overhead:
percentage: 0.05 # Home office overhead
amount: 137500
subtotal_2: 2887500
profit:
percentage: 0.05 # Varies by market/risk
amount: 144375
subtotal_3: 3031875
contingency:
design_contingency: 0.05 # For incomplete drawings
construction_contingency: 0.03 # For unforeseen conditions
amount: 242550
bond:
percentage: 0.015
amount: 49118
escalation:
rate: 0.04 # Annual
months_to_midpoint: 8
amount: 88536
total_estimate: 3412079
cost_per_sf: 341.21 # For 10,000 SF building
Contingency Guide
| Estimate Type | Design Contingency | Construction Contingency | |---|---|---| | Order of Magnitude | 15-25% | 10-15% | | Conceptual | 10-15% | 5-10% | | Detailed | 3-8% | 3-5% | | Definitive/Bid | 0-3% | 2-3% |
Contingency is NOT profit padding. Track and justify every contingency draw.
Phase 5: Bid Preparation & Strategy
Bid/No-Bid Decision Scorecard
Score 1-5 for each (minimum 30 to bid):
| Factor | Weight | Score | |---|---|---| | Project type experience | 3x | | | Client relationship/history | 2x | | | Current workload capacity | 3x | | | Geographic fit | 2x | | | Profit potential | 3x | | | Competition level (fewer = better) | 2x | | | Risk profile (lower = better) | 3x | | | Schedule feasibility | 2x | | | Bonding capacity available | 2x | | | Weighted Total | /110 | |
Bid Day Checklist
48 hours before:
- [ ] All sub quotes received (minimum 3 per trade)
- [ ] All material quotes current (check expiration dates)
- [ ] Addenda reviewed and incorporated (ALL of them)
- [ ] Scope gaps identified and plugged
- [ ] Math verified (independent check)
Day of bid:
- [ ] Final sub quotes plugged in
- [ ] Markup/profit decision finalized
- [ ] Alternates priced if required
- [ ] Unit prices calculated if required
- [ ] Bid bond secured
- [ ] Bid form completed correctly (every blank filled)
- [ ] Acknowledge ALL addenda on bid form
- [ ] Authorized signature
- [ ] Delivered before deadline (allow 1+ hour buffer)
Competitive Bid Strategy
Market conditions affect markup:
- Hot market (lots of work): Markup 8-12% (O&P combined)
- Normal market: Markup 6-10%
- Slow market: Markup 3-6%
- Must-win/strategic: Markup 2-4% (minimum to cover overhead)
Bid spread analysis (track your results):
Bid Spread = (Your Bid - Low Bid) รท Low Bid ร 100
- Consistently >10% high โ Your costs are inflated or productivity assumptions too conservative
- Consistently <2% from low โ You might be leaving money on the table
- Target: Within 3-5% of winning bid
Phase 6: Value Engineering (VE)
VE Opportunity Matrix
| System | VE Opportunity | Typical Savings | Risk Level | |---|---|---|---| | Structural | Steel vs concrete frame | 5-15% of structure | Medium | | Foundations | Spread vs mat vs piles | 10-30% of foundation | High (geotech dependent) | | Envelope | Curtain wall vs storefront | 15-30% of facade | Low-Medium | | Roofing | TPO vs modified bitumen | 10-20% of
Truncated for display โ read the full file on GitHub.
Related Skills
x402
121.0kSet up Browser Use Cloud payments with x402 โ pay per request from a crypto wallet (USDC on Base mainnet), no signup or API key.
algorithmic-art
177.9kCreating algorithmic art using p5.js with seeded randomness and interactive parameter exploration. Use this when users request creating art using code, generative art, algorithmic art, flow fields, or particle systems.
pptx
177.9kUse this skill any time a .pptx or .potx file is involved in any way โ as input, output, or both. This includes: creating slide decks, pitch decks, or presentations; reading, parsing, or extracting text from any .pptx or .potx file (even if the extracted content will be used elsewhere, like in an emโฆ
design
149.0kComprehensive design skill: brand identity, design tokens, UI styling, logo generation (55 styles, Gemini, Atlas Cloud, or MuAPI AI), corporate identity program (50 deliverables, CIP mockups), HTML presentations (Chart.js), banner design (22 styles, social/ads/web/print), icon design (15 styles, SVGโฆ